flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

SCAU unveils concept for a Ferris wheel hotel in Paris

Hotel Facilities

SCAU unveils concept for a Ferris wheel hotel in Paris

Hotel guests will slowly loop around the structure and get views from the banks of the Seine.


By Mike Chamernik, Associate Editor | November 5, 2015
SCAU Architectes design Ferris wheel hotel in Paris

The wheel's 19 pods will make a full revolution every half hour. Renderings courtesy SCAU

Ever feel that a five-minute ride on a Ferris wheel just isn’t long enough? Or that it really is so enjoyable and scenic that you didn’t want to get off?

Architects Maxime Barbier and Luc Delamain, from Paris-based SCAU, are planning to build a water wheel hotel with pods that will constantly rotate, just like the amusement park ride. The Telegraph reports that each of the 19 rooms will be 12 feet long, soundproof, and have its own fully-padded sleeping chamber, bathroom, and window.

The wheel will rotate slowly, making a full loop every half hour. To help in the case of emergencies, the wheel will only be 100 feet tall. The cost of a night’s stay in the wheel will be about 300 euros, or $326.

The plan is for the hotel to relocate every six months, possibly to face other European landmarks like the Eifel Tower and Big Ben. Its initial location will be on the banks of the Seine river.

“Like all the world’s big cities, Paris is reclaiming its river and the wheel hotel will be an attraction for tourists and locals,” Barbier told the Telegrah. “It will offer a new way to contemplate the city, sometimes from the level of the river and then from the level of the rooftops.”

 

Related Stories

Hotel Facilities | Apr 21, 2021

First newly constructed Signia by Hilton Hotel to be built in Atlanta

Signia by Hilton is a new upscale brand from Hilton Worldwide Holdings Inc.

Hotel Facilities | Mar 16, 2021

Navy Pier’s first hotel opens

KOO designed the project.

AEC Tech | Mar 4, 2021

The Weekly show, March 4, 2021: Bringing AI to the masses, and Central Station Memphis hotel

This week on The Weekly show, BD+C editors speak with AEC industry leaders about the award-winning Central Station Memphis hotel reconstruction project, and how Autodesk aims to bring generative design and AI tools to the AEC masses.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

Hotel Facilities | Feb 16, 2021

Santa Monica Professional Building restored into a modern hotel

Howard Laks Architects designed the project.

Market Data | Feb 1, 2021

The New York City market is back on top and leads the U.S. hotel construction pipeline

New York City has the greatest number of projects under construction with 108 projects/19,439 rooms.

Market Data | Jan 29, 2021

The U.S. hotel construction pipeline stands at 5,216 projects/650,222 rooms at year-end 2020

At the end of Q4 ‘20, projects currently under construction stand at 1,487 projects/199,700 rooms.

Modular Building | Jan 26, 2021

Offsite manufacturing startup iBUILT positions itself to reduce commercial developers’ risks

iBUILT plans to double its production capacity this year, and usher in more technology and automation to the delivery process.

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

boombox1 - default
boombox2 -
native1 -

More In Category




Giants 400

Top 80 Hotel Construction Firms for 2023

Suffolk Construction, STO Building Group, PCL Construction Enterprises, AECOM, and Brasfield & Gorrie top BD+C's ranking of the nation's largest hotel and resort general contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021