The new $40.4 million Roadrunner Athletics Center of Excellence (RACE) has opened on the University of Texas at San Antonio (UTSA) campus. RACE is the latest milestone in the university’s multi-tiered project that will enable the success of student-athletes and provide state-of-the-art recreational facilities to the San Antonio Community.
RACE will serve as the central hub of UTSA Athletics and help attract Division I student-athletes to the school. The nearly 95,000-sf facility spans more than 10 acres near the southwest corner of the UTSA Main Campus. It will feature multiple practice fields (one synthetic field and one natural grass field), academic spaces, a sports medicine center, strength and conditioning facilities, locker rooms, meeting rooms, a student-athlete lounge, and office space for coaches and administrative staff.
SEE ALSO: Austin FC’s Q2 Stadium completes
The project features an efficient design that concentrates on athletes’ use and experience while maximizing useable space with a column-free interior. The extensive use of concrete and glass helps bring natural light and views of the campus into the building.
“Previously, facilities were spread throughout the campus and even off-campus. RACE provides the opportunity for student-athletes to optimize every minute of their day,” said Austin Welsh, Populous Associate Principal, in a release.
Upcoming phases of the project will include the addition of a covered pavilion over the synthetic turf practice field and the construction of a facility at the university’s Park West Campus. Populous designed the project in collaboration with MarmonMok. Joeris General Contractors served as the construction firm.
Related Stories
University Buildings | May 5, 2023
New health sciences center at St. John’s University will feature geothermal heating, cooling
The recently topped off St. Vincent Health Sciences Center at St. John’s University in New York City will feature impressive green features including geothermal heating and cooling along with an array of rooftop solar panels. The geothermal field consists of 66 wells drilled 499 feet below ground which will help to heat and cool the 70,000 sf structure.
Mass Timber | May 1, 2023
SOM designs mass timber climate solutions center on Governors Island, anchored by Stony Brook University
Governors Island in New York Harbor will be home to a new climate-solutions center called The New York Climate Exchange. Designed by Skidmore, Owings & Merrill (SOM), The Exchange will develop and deploy solutions to the global climate crisis while also acting as a regional hub for the green economy. New York’s Stony Brook University will serve as the center’s anchor institution.
University Buildings | Apr 24, 2023
Solving complicated research questions in interdisciplinary facilities
University and life science project owners should consider the value of more collaborative building methods, close collaboration with end users, and the benefits of partners who can leverage sector-specific knowledge to their advantage.
Green | Apr 21, 2023
Top 10 green building projects for 2023
The Harvard University Science and Engineering Complex in Boston and the Westwood Hills Nature Center in St. Louis are among the AIA COTE Top Ten Awards honorees for 2023.
Higher Education | Apr 13, 2023
Higher education construction costs for 2023
Fresh data from Gordian breaks down the average cost per square foot for a two-story college classroom building across 10 U.S. cities.
Market Data | Apr 11, 2023
Construction crane count reaches all-time high in Q1 2023
Toronto, Seattle, Los Angeles, and Denver top the list of U.S/Canadian cities with the greatest number of fixed cranes on construction sites, according to Rider Levett Bucknall's RLB Crane Index for North America for Q1 2023.
University Buildings | Apr 11, 2023
Supersizing higher education: Tracking the rise of mega buildings on university campuses
Mega buildings on higher education campuses aren’t unusual. But what has been different lately is the sheer number of supersized projects that have been in the works over the last 12–15 months.
Contractors | Apr 10, 2023
What makes prefabrication work? Factors every construction project should consider
There are many factors requiring careful consideration when determining whether a project is a good fit for prefabrication. JE Dunn’s Brian Burkett breaks down the most important considerations.
Smart Buildings | Apr 7, 2023
Carnegie Mellon University's research on advanced building sensors provokes heated controversy
A research project to test next-generation building sensors at Carnegie Mellon University provoked intense debate over the privacy implications of widespread deployment of the devices in a new 90,000-sf building. The light-switch-size devices, capable of measuring 12 types of data including motion and sound, were mounted in more than 300 locations throughout the building.
Architects | Apr 6, 2023
New tool from Perkins&Will will make public health data more accessible to designers and architects
Called PRECEDE, the dashboard is an open-source tool developed by Perkins&Will that draws on federal data to identify and assess community health priorities within the U.S. by location. The firm was recently awarded a $30,000 ASID Foundation Grant to enhance the tool.