Massachusetts Maritime Academy is located in a flood zone on Cape Cod, which restricts its potential building area. To provide MMA more dormitory rooms and cadet amenities, the Building Team, led by Prellwitz Chilinski Associates and Shawmut Design and Construction, reorganized five interconnected buildings, bolted a six-story wing onto an existing building, and added 300 beds to the campus. The two-story “overbuild” employed block and plank construction with drag strut detailing to connect it to the existing building.
Construction took three years—and 11 permits—to complete. Work could only be done in the summer or during the 10 weeks of winter when cadets were training at sea.
A new glass entrance and connector space consolidates student services into one location. A skylit boardwalk leads to 12 social spaces, a fitness center, offices, a mess deck with 200 seats, and a 100-seat dining lounge.
PROJECT SUMMARY
Bronze Award Winner | Buzzards Bay, Mass.
Building Team: Shawmut Design and Construction (submitting firm, GC); Prellwitz Chilinski Associates (submitting firm, architect); Massachusetts Maritime Academy (owner); ODEH Engineers (SE); AFK Group (MEP); WaypointKLA (CM).
Details: 324,000 sf. Construction cost: $51.6 million. Construction time: December 2012 to August 2015. Delivery Method: CM at risk.
Related Stories
Reconstruction Awards | Nov 12, 2018
Cincinnati Music Hall: Saving a cultural anchor
Cincinnati uses ‘skillful triage’ to bring its endangered Music Hall up to date.
Reconstruction Awards | Dec 1, 2017
Rescue mission: Historic movie palace is now the centerpiece of Baltimore’s burgeoning arts hub
In restoring the theater, the design team employed what it calls a “rescued ruin” preservation approach.
Reconstruction Awards | Dec 1, 2017
Gothic revival: The nation’s first residential college is meticulously restored
This project involved the renovation and restoration of the 57,000-sf hall, and the construction of a 4,200-sf addition.
Reconstruction Awards | Dec 1, 2017
Rockefeller remake: Iconic New York tower is modernized for its next life
To make way for new ground-floor retail and a more dramatic entrance and lobby, the team removed four columns at the ground floor.
Reconstruction Awards | Nov 30, 2017
BD+C's 2017 Reconstruction Award Winners
Provo City Center Temple, the Union Trust Building, and the General Motors Factory One are just a few of the projects recognized as 2017 Reconstruction Award winners.
Reconstruction Awards | Nov 29, 2017
College credit: Historic rehab saves 50% on energy costs
The project team conducted surveys of students, faculty, and staff to get their input.
Reconstruction Awards | Nov 29, 2017
Amazing grace: Renovation turns a church into elegant condos
The windows became The Sanctuary’s chief sales edge.
Reconstruction Awards | Nov 28, 2017
Broadway melody: Glass walls set just the right tone for a historic lobby in Lower Manhattan
The adaptation of the 45,000-sf neoclassical lobby at 195 Broadway created three retail spaces and a public walkway.
Reconstruction Awards | Nov 27, 2017
Higher education: The rebirth of a Washington, D.C., high school
The project team, led by architect Perkins Eastman, restored the original cupola.
Reconstruction Awards | Nov 27, 2017
Bank statement: A project team saves a historic bank, yielding 100% leaseup for the developer
The project team had to fix poor renovations made in the ’50s.