flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Reconstruction Awards: Marilyn I. Walker School of Fine and Performing Arts, Brock University

Reconstruction Awards

Reconstruction Awards: Marilyn I. Walker School of Fine and Performing Arts, Brock University

The five-story brick-and-beam structure is an adaptive reuse of the Canada Hair Cloth Building, where coat linings and parachute silks were once made.


By BD+C Staff | November 16, 2016

A painting studio at the Walker School of Fine and Performing Arts. Columns were replaced with exposed 40-foot trusses to open up the space. The facility also has framing studios, music practice rooms, offices, and a 280-seat theatre. Tom Arben Photography 

St. Catherines is a Rust Belt city in the province of Ontario. Last November, in response to local demand for the arts, the city of 131,400 opened the four-stage FirstOntario Performing Arts Centre. That event was preceded last September by the unveiling of Brock University’s Marilyn I. Walker School of Fine and Performing Arts.

The five-story brick-and-beam structure is an adaptive reuse of the Canada Hair Cloth Building, where coat linings and parachute silks were once made. Diamond Schmitt Architects led the repurposing of the original 1888 structure and the design of a 35,000-sf addition that supports a new 280-seat studio theatre.

The project consolidates the university’s fine and performing arts facilities in a single downtown location for 500 students. 

All work had to meet the university’s strict Facility Accessibility Design Standards. A former raceway water channel for the looms was preserved as a pedestrian path. The contractor (the aptly named Bird Construction) even made sure not to disturb the chimney swifts that were nesting in the
old factory.

 

Tom Arben Photography. 

 

PROJECT SUMMARY 

 

Silver Award Winner | St. Catherines, Ont.

Building Team: Diamond Schmitt Architects (submitting firm, architect); Blackwell (SE); Crossey Engineering (mechanical); Mulvey & Banani International (electrical); AECOM (plumbing); Prism Partners (CM); and Bird Construction (GC).

Details: 94,000 sf. Construction cost: $45 million. Construction time: September 2012 to September 2015. Delivery method: Stipulated sum. 

Related Stories

Reconstruction Awards | Nov 27, 2017

Patient friendly: The University of Chicago Medicine Center for Care and Discovery adds 203 new beds

Strict infection control and life safety measures were implemented to protect patients on other floors as work proceeded.

Reconstruction Awards | Nov 27, 2017

The birthplace of General Motors

The automotive giant salvages the place from which it sprang, 131 years ago.

Reconstruction Awards | Nov 21, 2017

Honor Guard: San Francisco’s historic Veterans Building pays homage to those who served in World War I and other foreign wars

The Veterans Building houses the War Memorial staff, the city’s Arts Commission, the Opera’s learning center and practice/performance node, the Green Room reception venue, and the 916-seat Herbst Theatre.

Reconstruction Awards | Nov 20, 2017

Eyes wide open: Students can see their new home’s building elements

The two-phase project revamped an opaque, horseshoe-shaped labyrinth of seven buildings from the ’60s and ’70s.

Reconstruction Awards | Nov 17, 2017

Gray lady no more: A facelift erases a landmark’s wrinkles, but not her heritage

The Building Team restored the granite and terra cotta façade and reclaimed more than 500 double-hung windows.

Reconstruction Awards | Nov 17, 2017

Elegance personified: New life for a neglected but still imposing retail/office space

The building was in such disrepair that much of the reconstruction budget had to go toward structural, mechanical, and electrical infrastructure improvements.

Reconstruction Awards | Nov 16, 2017

Back to the '20s: Coney Island gets a new eatery reminiscent of the past

This project included the restoration of the landmark Childs Restaurant.

Reconstruction Awards | Nov 15, 2017

Foyer fantastique: Faded images provide the key to a historic theater's lobby restoration

The restoration relied heavily on historic photos and drawings.

Reconstruction Awards | Nov 14, 2017

Hallowed ground: A Mormon temple rises from the ashes of a fire-ravaged historic tabernacle

Parts of the tabernacle’s exterior shell were the only things that survived the blaze.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021