flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Post Tower Wins CTBUH 10-Year Award

Post Tower Wins CTBUH 10-Year Award

Completed in 2002, the Post Tower blazed new trails by using technically integrated design to deliver high performance. 


By Council on Tall Buildings | July 28, 2014
Post Tower, a 163-meter office tower in Bonn, Germany, has received the 10 Year Award from the Council on Tall Buildings and Urban Habitat (CTBUH).
 
The 10 Year Award recognizes proven value and performance in a tall building, across one or more of a wide range of criteria, over a period of 10 years since its completion. This award gives an opportunity to reflect back on buildings that have been completed and operational for at least a decade, and acknowledge those projects which have performed successfully, long after the ribbon-cutting ceremonies have passed. 
 
Completed in 2002, the Post Tower blazed new trails by using technically integrated design to deliver high performance. Its two elliptical volumes, with an atrium between, work together with site and wind orientation, a double-skin, operable façade, and stack ventilation to remove much of the need for mechanical ventilation commonly found in large buildings. This not only allows the building to consume only 75 kilowatt-hours per square meter per year, which is 79 percent less energy than a typical office building of its size; it also makes for pleasant interior sky garden spaces and a more efficient floor plate. 
 
“The Post Tower was an early touchstone for sustainable tower design and has provided a very useful model through its attention to performance,” said Awards Jury Chair Jeanne Gang, founding principal, Studio Gang Architects. “The jury was impressed with the continued monitoring and proof of concept.”
 
“The Post Tower undoubtedly changes the way we look at sustainable building for the high rise typology,” said Awards juror David Gianotten, managing director, Office for Metropolitan Architecture (OMA). “The design single-handedly changed the way we look at façade and office design to date. It has become an exemplar sustainable icon in contemporary architecture.”
 
The other 10 Year Finalists considered for this Award were:
• Taipei 101, Taiwan, China
• Torre Agbar, Barcelona, Spain
• Uptown Munchen, Munich, Germany
• Highlight Towers, Munich, Germany 
• Time Warner Center, New York City, United States 
• Bloomberg Tower, New York City, United States 
• Tower Palace Three, Seoul, South Korea
 
All award winners, including the 2014 Best Tall Building Winners and Finalists, will be recognized at the CTBUH 13th Annual Awards Symposium, which will take place at the Illinois Institute of Technology, Chicago, on November 6. The symposium will be followed by the Awards Ceremony and Dinner in the iconic Crown Hall, designed by Mies van der Rohe. Click here to see the previously announced 2014 regional Best Tall Building award winners, here to see the 2014 Urban Habitat award winner and finalist, here to see the 2014 Tall Building Innovation Award winner and finalist, and here to see the 2014 Performance Award winner and finalist.
 
The CTBUH Awards are an independent review of new projects, judged by a panel of industry experts. Projects are recognized for making an extraordinary contribution to the advancement of tall buildings and the urban environment, and for achieving sustainability at the broadest level.
 
Winners and finalists are featured in the annual CTBUH Awards Book, which is published in conjunction with a major global publisher and distributed internationally each year.

Related Stories

Mass Timber | Apr 22, 2024

British Columbia changing building code to allow mass timber structures of up to 18 stories

The Canadian Province of British Columbia is updating its building code to expand the use of mass timber in building construction. The code will allow for encapsulated mass-timber construction (EMTC) buildings as tall as 18 stories for residential and office buildings, an increase from the previous 12-story limit. 

Standards | Apr 22, 2024

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.

Building Materials | Apr 22, 2024

Tacoma, Wash., investigating policy to reuse and recycle building materials

Tacoma, Wash., recently initiated a study to find ways to increase building material reuse through deconstruction and salvage. The city council unanimously voted to direct the city manager to investigate deconstruction options and estimate costs. 

Student Housing | Apr 19, 2024

$115 million Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021