The performing arts center of the future

Performing Arts Centers

The performing arts center of the future

For more than 15 years, LPA has completed many projects for the East Central Independent School District (ECISD), and the Performing Arts Center is just one example of how a research-based, collaborative process can improve outcomes.


By Mark Oppelt | May 8, 2017

As designers, we look to inform the design process with an understanding of purpose and function before creating a concept. How will this building be used? Who will be using it? How can we create long-term value for our client? What precedents are there? This informed approach was taken in the design for East Central High School’s Performing Arts Center in San Antonio.

For more than 15 years, LPA has completed many projects for the East Central Independent School District (ECISD), and the Performing Arts Center is just one example of how a research-based, collaborative process can improve outcomes.Totaling 37,500 square feet, the building design includes a 1,000-seat auditorium with lobby and stage 6,800 square feet of theater program space with dressing rooms, costume/scene shop, full-scale rehearsal room, 3,250 square feet of choir space for an ensemble, sound/recording, uniform and office space as well as support areas such as concessions, restrooms and box office.

 

Inspired by the Arts

The design is inspired by the entire process of a theatrical performance production. At the project inception, LPA performed extensive research on the process of a theatrical production—from script writing and rehearsals to stage construction and performances. We designed the Performing Arts Center to display the timeline of the theatrical process.

The building is a literal reflection of this timeline, allowing the building to function as a teaching tool for the students and the community. At each phase in a production, the building displays careful curated and sequenced views in and out, simultaneously celebrating the process of a theater production and creating a “feedback loop” around the auditorium. This approach provides a public connection into each phase, announcing the dynamic act of theater production as just as important as the performance itself.

 

 

A Building with No Back

In the conceptual design phase, the integrated team conducted extensive site analysis to understand how the building was impacted by traffic flow, climate and the elements. In summary, this site had no natural “service zone”—a full chorus of circulation passed around each side of the building—LPA embraced the challenge of developing a “building with no back” by exposing it to both the campus and the community.

Though the performing arts center will be located on the school’s campus, it will be used by the entire district, and it is important that the building is recognized as a community resource.

 

Balancing Sun and Shade

East- and west-facing vertical fins and deep roof overhangs are thoughtfully positioned to mitigate the harsh South Texas sun and heat gain. Solar analysis was used to determine the appropriate location, spacing and depth of those elements in design. The emphasis on daylighting in key areas such as the lobby and rehearsal room will provide long-term cost savings in terms of a lower lighting load on the building.

 

Commitment to Cost-Saving

Being on budget and cost-effective is always part of our strategic approach to educational design. The careful organization of spaces around a focused circulation corridor yielded a building that was 9% more efficient than the projected square footage.

The auditorium itself directly benefited from the costs savings yielded, where top of the line acoustics and building technology are essential for future proofing the facility. We also thoughtfully used structurally-interrupted storefront instead of curtain wall to manage the cost of the full-height glass used throughout the space.

 

 

The Movement of Sound

The design team’s research into the science of acoustics directly shaped the auditorium interior. Acoustical diffusion and dispersion were needed in key areas. The accordion walls along the interior vary to reflect these acoustical necessities, reinforcing the idea that a building can be a teaching tool for the students.

The Performing Arts Center project at East Central High School is the final piece of a master plan for of the campus that has been implemented through two different bond issues over a 10-year period. The project is estimated to break ground this summer and will celebrate the dynamic art of theater production with the campus and community while showcasing innovative design solutions.

 

Mark Oppelt, Principal at LPA San Antonio, has provided project design and management expertise to more than 350 Texas K-12 schools, civic and religious project in the San Antonio.

Related Stories

| Jul 23, 2014

Architecture Billings Index up nearly a point in June

AIA reported the June ABI score was 53.5, up from a mark of 52.6 in May.

| Jul 21, 2014

Economists ponder uneven recovery, weigh benefits of big infrastructure [2014 Giants 300 Report]

According to expert forecasters, multifamily projects, the Panama Canal expansion, and the petroleum industry’s “shale gale” could be saving graces for commercial AEC firms seeking growth opportunities in an economy that’s provided its share of recent disappointments.

| Jul 18, 2014

Contractors warm up to new technologies, invent new management schemes [2014 Giants 300 Report]

“UAV.” “LATISTA.” “CMST.” If BD+C Giants 300 contractors have anything to say about it, these new terms may someday be as well known as “BIM” or “LEED.” Here’s a sampling of what Giant GCs and CMs are doing by way of technological and managerial innovation.

| Jul 18, 2014

Top Construction Management Firms [2014 Giants 300 Report]

Jacobs, Barton Malow, Hill International top Building Design+Construction's 2014 ranking of the largest construction management and project management firms in the United States. 

| Jul 18, 2014

Top Contractors [2014 Giants 300 Report]

Turner, Whiting-Turner, Skanska top Building Design+Construction's 2014 ranking of the largest contractors in the United States. 

| Jul 18, 2014

Engineering firms look to bolster growth through new services, technology [2014 Giants 300 Report]

Following solid revenue growth in 2013, the majority of U.S.-based engineering and engineering/architecture firms expect more of the same this year, according to BD+C’s 2014 Giants 300 report. 

| Jul 18, 2014

Top Engineering/Architecture Firms [2014 Giants 300 Report]

Jacobs, AECOM, Parsons Brinckerhoff top Building Design+Construction's 2014 ranking of the largest engineering/architecture firms in the United States.

| Jul 18, 2014

Top Engineering Firms [2014 Giants 300 Report]

Fluor, Arup, Day & Zimmermann top Building Design+Construction's 2014 ranking of the largest engineering firms in the United States.

| Jul 18, 2014

Top Architecture Firms [2014 Giants 300 Report]

Gensler, Perkins+Will, NBBJ top Building Design+Construction's 2014 ranking of the largest architecture firms in the United States. 

| Jul 18, 2014

2014 Giants 300 Report

Building Design+Construction magazine's annual ranking the nation's largest architecture, engineering, and construction firms in the U.S.

boombox1 - default
boombox2 -
native1 -

More In Category



Performing Arts Centers

Frank Gehry-designed expansion of the Colburn School performing arts center set to break ground

In April, the Colburn School, an institute for music and dance education and performance, will break ground on a 100,000-sf expansion designed by architect Frank Gehry. Located in downtown Los Angeles, the performing arts center will join the neighboring Walt Disney Concert Hall and The Grand by Gehry, forming the largest concentration of Gehry-designed buildings in the world.


Giants 400

Top 35 Performing Arts Center and Concert Venue Construction Firms for 2023

The Whiting-Turner Contracting Company, Holder Construction, McCarthy Holdings, Clark Group, and Gilbane Building Company top BD+C's ranking of the nation's largest performing arts center and concert venue general contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021