flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Oversized healthcare: How did we get here and how do we right-size?

Oversized healthcare: How did we get here and how do we right-size?

In today's healthcare environment, hospital leaders cannot afford to build oversized facilities, but in some cases, they cannot afford not to. 


By Curtis Skolnick, Managing Director, CBRE Healthcare | November 8, 2013

Healthcare facilities, especially our nation's hospitals, have steadily become larger over the past couple of decades. The growth has occurred despite stabilization, and in some markets, a decline in inpatient utilization. One measure of hospital size is Building Gross Square Feet (BGSF) per bed. BGSF is a measure of total facility envelope. Community hospitals built 30 years ago would typically range in the 1,300 - 1,600 BGSF per bed. However, today, a range of 2,200 - 2,800 BGSF per bed is not uncommon.  

In today's healthcare environment, hospital leaders cannot afford to build these oversized facilities, but in some cases, they cannot afford not to. Healthcare executives delivering care in outdated 30+ year old facilities have to re-invest to meet new standards, keep up with competitors, and provide the services that are required in today's care environments. So what is going on here?

There are many factors influencing facility size with some of these changes being evolutionary and some being new and revolutionary (e.g. private rooms are evolutionary while hybrid ORs are new and revolutionary).

Inpatient Rooms Size and Occupancy

If you take a tour of an older hospital inpatient unit today, you will find rooms with multiple beds (two or three in some cases), no private toilet/shower room and little space for anyone but the patient. These rooms' sizes are in the 300 net square feet (NSF) range. Net square feet being the inside room dimension.

Today, private rooms are the norm and were actually recommended in the 2010 FGI Guidelines for Design and Construction of Healthcare Facilities. For a variety of reasons (patient privacy, infection control, patient preference), hospitals have moved away from multi-bed inpatient rooms. The size of these private inpatient rooms is typically between 260 - 320 NSF. The rooms include private toilet/showers; distinct zones for patient, caregiver, and family; and enough clear space for a variety of mobile technology that was not even dreamt of 50 years ago. Thus, the amount of NSF per patient in the room alone has just about doubled.

Facility Flexibility

Have you ever heard the terms Universal Room or Acuity Adaptable Room? These are rooms that either on a daily basis or with renovation can be utilized as a general medical/surgical room or as a Critical Care Unit (CCU) room. Given that the FGI Guidelines call for a minimum of 200 NSF of clear space for a CCU room and have requirements that the bed be one (1) foot from the wall with four (4) feet of clearance around the sides of the bed, new critical care rooms are rarely designed below 280 NSF today.

In an effort to standardize and provide a flexible bed chassis, hospitals are being designed and built with interchangeable room sizes for med/surg and CCU. Thus med/surg rooms are typically no less than 280 NSF. Any less, and acuity flexibility is compromised.

Privacy 

In 1996 the Health Insurance Portability and Accountability Act (HIPAA) was enacted. This Act protects the privacy of individually identifiable health information. Since then, hospitals have re-tooled themselves to protect not only electronic information but what is spoken.

Americans culturally are modest people when compared to our European counterparts. This modesty extends into the hospital as well. As people sometimes say about Apple computers, "They just work," the same philosophy can be applied to private rooms, "They just make sense." When checking into a hotel, we are not paired in a two-bed room with some stranger that just happens to be staying at the hotel for the same nights. Why, when at our most vulnerable, during a time of extreme stress, are we placed in a room with someone else undergoing a similar physical and mental trauma? Privacy is more than just about the protection of information, it is about ensuring a clarity of focus for the care-givers, reducing nosocomial infections, ensuring quality rest free from roommate distractions, and protecting patient and family dignity during a stressful time. However, this privacy has come with some costs and benefits.

Privacy is not confined to the inpatient unit. Private rooms extend to the emergency department, peri-operative space (pre-op prep and phase II PACU), registration and admitting areas, and observation/Clinical Decision Units. This increases the space needed to care for patients. Square footage per patient increases to account for eliminating some economies of scale associated with sharing space as well as the need for door swings where there was once a pull curtain.

There is evidence that bed/room utilization and occupancy rates are higher in a private facility and lengths of stay are lowered thus increasing efficiency and throughput which helps off-set facility costs. Also, anecdotally, a market share and volume "bump" can be associated with private rooms as the market and patients respond positively to this new environment.

Hospital planners and designers are becoming more creative in sharing some of these private spaces. For instance, observation and emergency departments are typically busiest in the mid-afternoon, evening, and pre-dawn hours while peri-operative service spaces are typically busiest in the morning and early afternoon hours. Even though Prep and Phase II PACU rooms may be shared to account for utilization swings (prep in the morning, phase II PACU later), some are suggesting that a "universal care" room shared between ED, peri-op, and observation could minimize room down time and increase room utilization.

Sharing would decrease the total number of rooms required. This model is challenging to operationalize and has not been widely accepted - thus, time will tell.

Patients' Needs

The Americans with Disabilities Act (ADA) of 1990 changed the regulations related to the size of certain rooms in hospitals and outpatient settings (and other non-healthcare workplace areas as well). It is hard to believe that before 1990 there was little regulation regarding "accessible" spaces for those people most in need: healthcare patients. In hospitals, outpatient centers, and clinics nationwide, patients in wheelchairs, using walkers, visually and hearing impaired, or requiring some other source of assistance could not ambulate or use rooms in the building where they were receiving care. This juxtaposition did not go unnoticed and the facility codes have changed to allow "accessible" and ADA compliant space.

And it is not just for patients, but also for the public, families, and workforce in the buildings. 15 NSF closet size toilet rooms have been replaced with wheelchair accessible 50 NSF toilet rooms in patient care, public and staff areas. Exam rooms have increased in size from well under 100 NSF to a standard of 120 NSF to take into account accessibility, patient, and caregiver needs. Public spaces (lobbies, cafeterias, meeting rooms) provide more space per seat to allow for patient, public, and staff with disabilities to more freely travel and remove barriers to utilizations.

Obesity is also an American epidemic contributing to a host of co-morbid conditions (diabetes, hypertension, sleep apnea, etc.) that decrease the general health of the population and contribute to high utilization of health care services. Some 30%-35% of Americans are overweight, one of the highest rates of industrialized nations. Caring for the obese and bariatric patients requires oversized spaces and special equipment as evidenced in larger waiting room chairs, bariatric beds and wheelchairs, space for both mobile and fixed lift assist devices, and larger exam room doors.

Technology and Medical Equipment 

Diagnostic and treatment spaces have increased over the years. A standard size for an operating room (OR) used to be approximately 450 - 480 NSF. Now, it is difficult to find a hospital OR being designed any less that 600 - 650 NSF. ORs have become larger given the more complex nature of cases being handled. These complex cases increased the number of care-givers in the room as well as the amount of equipment.

Computers, larger anesthesia carts, perfusion machines, integrated ceiling mounted monitors, robotic surgery consoles and mobile x-ray are just some of the equipment that are routinely brought into the OR. There needs to be room for all of this "stuff". Consider a hybrid or integrated imaging OR where interventional radiology equipment or MRI are fixed in the room, these ORs approach 800 - 1,000 NSF, not to mention the additional space needed for radiologic control and equipment.

The ubiquitous presence of large imaging equipment (MRI, PET, CT, etc.) and/or the increase in utilization and installation of linear accelerators are becoming standards-of-care and thus increasing the size of our healthcare facilities.

Physical Infrastructure Needs

The above are just a few of the reasons our facilities have grown over the last couple of decades. The physical envelopes that house all of the care and supportive space have also played a factor:

• Becoming a more connected platform, information technology has increased the need for server space, data centers, distributed MDF/data rooms, IT support and data analyst office space, which are now standard elements.  

• The Evidence Based Design (EvBD) movement has increased the size of buildings and contributed to higher "grossing factors" (the amount of building space on top of departmental space) related to bringing in more natural light and separation of on-stage/off-stage space.  

• The LEED/Sustainable Design movement as well as changes in environment of care codes promulgated by the Joint Commission and American Society for Healthcare Engineers (ASHE) has increased space related to infrastructure and increased floor to floor heights allowing for larger, but more energy efficient, mechanical equipment.  

• The desire to create more standard, flexible, and "future-proof" inpatient and large ambulatory facilities has increased the size of the structural grid. Most facilities are being built on a 28' to 30' column bay. This increases overall size but provides a fungible footprint.

So, What Can You Do About It?

Healthcare executives, facilities managers, architectural and engineering, designers, planners, clinicians, and construction managers have responded by planning, designing, and building "right-sized" facilities utilizing some of the following tactics:

• Leveraging the System: As more and more independent hospitals continue to become part of an "Integrated Delivery System" it is not necessary to provide duplicative services across operating units. Non-direct care administrative services, information technology departments, full-service lab, pathology, and supply chain functions are being centralized to serve multiple operating units. This leaves space on hospital and ambulatory campuses for some core elements such as on-site "stat" and routine lab, a few Human Resource specialists, or emergency level stock to be included. This model is helping to increase efficiencies and reduce duplication.

• Improve Processes: Process improvement such as Lean and Six-Sigma is beneficial for eliminating waste. Streamlining and standardizing processes, clinical and supportive, helps designers to plan for only the rooms and space necessary for a particular function. Often, this can increase space by decentralizing elements, but may reduce overall space as functions are streamlined and the number of Key Planning Units (KPUs - e.g. beds, ORs, ED rooms) are planned at threshold and best-in-class throughput metrics. Consider leveraging technology in public spaces by offering items such as check-in kiosks (like at the airport) to reduce the need for large check-in and registration zones. It is more process and space efficient.

• Get Creative with Infrastructure: At a hospital in the mid-Atlantic, a modular central plant is being built for a much lower cost and in less space than a steel and concrete structure. This reduces space footprint cost and increases flexibility. Utilizing wireless technologies can reduce or eliminate the need for large data rooms. And, utilizing Building Information Management (BIM) technology when designing the building will most efficiently support mechanical, electrical, and plumbing infrastructure.

• Build for What is Needed: Reducing shell space and building enough capacity for "day one" operations and some modest growth is a solid planning strategy. Ensuring that capacity can be filled before expansion is prudent business in today's unsteady healthcare world. Working smart and planning for ready and easy expansion should be the approach. The last thing any healthcare organization wants today is big, empty, unutilized space. 

All of the factors above that have increased the sizes of our healthcare facilities are ostensibly necessary as care delivery evolves. Privacy, creating a sustainable facility, and implementing new medical technologies are good for everyone. It is all about balance in today's cost-conscious environments. Whether it is for a large replacement hospital, off-site ambulatory care center, or primary care physician office, first provide what is needed then consider providing for wants. Creative design, leveraging health system resources, prudent planning, integrated program/project management, and providing for efficient operations will help ensure functional, flexible, and efficient right-sized facilities.

Related Stories

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

Urban Planning | Apr 12, 2024

Popular Denver e-bike voucher program aids carbon reduction goals

Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.

Laboratories | Apr 12, 2024

Life science construction completions will peak this year, then drop off substantially

There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.

Multifamily Housing | Apr 12, 2024

Habitat starts leasing Cassidy on Canal, a new luxury rental high-rise in Chicago

New 33-story Class A rental tower, designed by SCB, will offer 343 rental units. 

Student Housing | Apr 12, 2024

Construction begins on Auburn University’s new first-year residence hall

The new first-year residence hall along Auburn University's Haley Concourse.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021