flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Obama Foundation reveals first look at the Obama Presidential Center

Cultural Facilities

Obama Foundation reveals first look at the Obama Presidential Center

The design comprises three buildings set in the public space of Jackson Park on Chicago’s South Side.


By David Malone, Associate Editor | May 4, 2017

Image courtesy of the Obama Foundation

The Obama Foundation has recently given the first look at the design for the Obama Presidential Center. The new campus, designed by Todd Williams Billie Tsien Architects, is made up of three main buildings that surround a public plaza that extends into the landscape.

The three buildings will be a multi-story museum, a library, and a forum. The library and the forum will both be one story and their roofs will be covered with plantings to create new parkland. Pathways will lead to the roofs of these buildings and provide views of Lake Michigan, the new public plaza, and the lagoon.

The museum will stand on the northern end of the campus and is meant to serve as the Center’s beacon and mark a visitor’s arrival. Classrooms, labs, and outdoor spaces are all included in the design. Additionally, the campus will be open to the public and provides spaces for events, trainings, and other gatherings. The goal of the new campus is to provide a space for “doing and making, as well as looking and learning,” the Obama Foundation website says.

 

Image courtesy of the Obama Foundation.

 

Early renderings show each of the three buildings clad in a light-colored stone. Each building has large swaths of glass incorporated into the design, as well. The campus will act as a transition space between the city, landscape, lagoon, and lake, and allow visitors to flow through the plaza and architecture and into the park beyond.

The project will be, at minimum, LEED v4 Platinum but the architects and planners are looking into the possibility of surpassing those qualifications.

Related Stories

| Aug 11, 2010

CTBUH changes height criteria; Burj Dubai height increases, others decrease

The Council on Tall Buildings and Urban Habitat (CTBUH)—the international body that arbitrates on tall building height and determines the title of “The World’s Tallest Building”—has announced a change to its height criteria, as a reflection of recent developments with several super-tall buildings.

| Aug 11, 2010

JE Dunn, Balfour Beatty among country's biggest institutional building contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Institutional Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Jacobs, Arup, AECOM top BD+C's ranking of the nation's 75 largest international design firms

A ranking of the Top 75 International Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Walter P Moore wins top award for Nerman Museum of Contemporary Art

With structural engineering from Walter P Moore, Nerman Museum of Contemporary Art has won the New Buildings Under $30 Million project category in the 2009 Structural Engineers Association of Kansas & Missouri (SEAKM) Awards Program.

| Aug 11, 2010

Architecture Billings Index flat in May, according to AIA

After a slight decline in April, the Architecture Billings Index was up a tenth of a point to 42.9 in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. Any score above 50 indicates an increase in billings.

| Aug 11, 2010

Construction employment declined in 333 of 352 metro areas in June

Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America.  The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.

| Aug 11, 2010

Jacobs, Hensel Phelps among the nation's 50 largest design-build contractors

A ranking of the Top 50 Design-Build Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Bowdoin College has country's first newly constructed LEED-certified ice arena

Bowdoin College's new Sidney J. Watson Arena, dedicated January 18, 2009, has become the first newly constructed ice arena in the United States to earn coveted LEED (Leadership in Energy and Environmental Design) certification from the United States Green Building Council (USGBC).

boombox1
boombox2
native1

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021