flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Site of former Motorola headquarters will become a mixed-use district

Mixed-Use

Site of former Motorola headquarters will become a mixed-use district

UrbanStreet Group and Antunovich Associates are developing the master plan for the project.


By David Malone, Associate Editor | June 13, 2019

All renderings courtesy Antunovich Associates

When Motorola decided to move its headquarters back to Chicago, it left a 225-acre campus vacant in Schaumburg, Ill. The large plot of land is now being redeveloped into a mixed-use living and entertainment district by UrbanStreet Group and Antunovich Associates.

Dubbed Veridian, the mixed-use development will feature residential space, office space, a hotel, entertainment, dining, and urban-style street retail. The site has been divided into multiple parcels of land, many of which will be sold to individual developers, with the goal being to bring an urban feel to the Chicago suburbs.

 

 

Currently, the development is set to feature the already completed Zurich headquarters; two parks, one measuring in at nine acres and one at 13 acres; a retirement village; an assisted living community; the Element at Veridian, a 260-unit luxury apartment building (set for completion in 2020); over 200 townhomes; a Top Golf; an atrium office building; a 220-key hotel; and a retail and entertainment “Town Center.” Motorola Solutions will also maintain a presence as one of Veridian’s corporate anchor tenants.

 

 

The retail and entertainment district will be highly walkable and include unique shopping and dining options. Additionally, it will host a variety of entertainment opportunities such as concerts, movies, and ice skating.

 

See Also: Gensler, Corgan reveal their design concepts for Uber Air Skyports

 

Antunovich Associates will initially be responsible for the planning and designing of the main Town Center parcel. This parcel will feature approximately 800,000 sf of built area within the retail core, not including the four parking structures that will support it. Construction on a new spine road and infrastructure is slated to begin later this year with phase one completion as soon as Fall of 2020.

 

 

 

Courtesy Veridian.

Tags

Related Stories

| Apr 4, 2012

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.

| Apr 3, 2012

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

boombox1 - default
boombox2 -
native1 -

More In Category

MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021