flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Site of former Motorola headquarters will become a mixed-use district

Mixed-Use

Site of former Motorola headquarters will become a mixed-use district

UrbanStreet Group and Antunovich Associates are developing the master plan for the project.


By David Malone, Associate Editor | June 13, 2019

All renderings courtesy Antunovich Associates

When Motorola decided to move its headquarters back to Chicago, it left a 225-acre campus vacant in Schaumburg, Ill. The large plot of land is now being redeveloped into a mixed-use living and entertainment district by UrbanStreet Group and Antunovich Associates.

Dubbed Veridian, the mixed-use development will feature residential space, office space, a hotel, entertainment, dining, and urban-style street retail. The site has been divided into multiple parcels of land, many of which will be sold to individual developers, with the goal being to bring an urban feel to the Chicago suburbs.

 

 

Currently, the development is set to feature the already completed Zurich headquarters; two parks, one measuring in at nine acres and one at 13 acres; a retirement village; an assisted living community; the Element at Veridian, a 260-unit luxury apartment building (set for completion in 2020); over 200 townhomes; a Top Golf; an atrium office building; a 220-key hotel; and a retail and entertainment “Town Center.” Motorola Solutions will also maintain a presence as one of Veridian’s corporate anchor tenants.

 

 

The retail and entertainment district will be highly walkable and include unique shopping and dining options. Additionally, it will host a variety of entertainment opportunities such as concerts, movies, and ice skating.

 

See Also: Gensler, Corgan reveal their design concepts for Uber Air Skyports

 

Antunovich Associates will initially be responsible for the planning and designing of the main Town Center parcel. This parcel will feature approximately 800,000 sf of built area within the retail core, not including the four parking structures that will support it. Construction on a new spine road and infrastructure is slated to begin later this year with phase one completion as soon as Fall of 2020.

 

 

 

Courtesy Veridian.

Tags

Related Stories

Mixed-Use | Jan 10, 2022

Mixed-use Arsenal Yards completes in Watertown’s East End

PCA master-planned the seven-building, one million sf destination and designed the urban village, residences, and open spaces.

Mixed-Use | Jan 5, 2022

Waterfront Station II breaks ground in Washington, D.C.

The mixed-use project will include 30% affordable housing.

Mixed-Use | Dec 21, 2021

Riverside Wharf will be Miami’s newest entertainment complex

Cube3 Architects is designing the project.

Mixed-Use | Nov 11, 2021

New mixed-use development breaks ground in Miami Beach

Domo Studio is designing the project and Origin Construction is the general contractor.

Mixed-Use | Oct 22, 2021

40 West 12th residential tower opens in Atlanta’s Midtown neighborhood

The project is part of the 1105 West Peachtree Development.

Multifamily Housing | Oct 20, 2021

Sacramento’s first luxury high-rise rental residences announced

Southern Land Company is developing the project.

Mixed-Use | Oct 11, 2021

Manhattan West opens the heart of New York City’s Far West Side

The project links several New York neighborhoods.

Mixed-Use | Oct 5, 2021

Ground-up mixed-use building completes near Wrigley Field

Hirsch/MPG Architecture + Planning designed the project.

boombox1 - default
boombox2 -
native1 -

More In Category

MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021