flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Narrow site, broad vision: LA Metro Light Rail Operations & Maintenance Facility

Building Team Awards

Narrow site, broad vision: LA Metro Light Rail Operations & Maintenance Facility

Gold Award: A slender building site had direct implications for the design of this light-rail facility.


By David Malone, Associate Editor | June 8, 2017

Large skylights flood the maintenance area with natural light and turn what could have been a dark warehouse into a bright workspace. Chang Kim photograph.

Nine and a half acres may sound like adequate space for a 70,000-sf building, but when that acreage is shoehorned into a narrow corridor, problems can quickly arise. Such was the case for the LA Metro Division 14 Expo Light Rail Operations & Maintenance Facility.

To make the building site work, the design team needed to make as efficient use of the space as possible. Building spaces overlap over the rail yard and maintenance area and 34-foot-long moment frames span two tracks. Part of the building’s main hallway hangs over the maintenance area, as well.

To account for the OCS and pantograph and still meet California’s seismic requirements, open-span moment frames that allow train travel were used in the north-south direction in combination with brace frames in the other direction.

The design of the long, narrow building is more than just a product of its location. The facility goes beyond the basic functionality requirements of a typical operations and maintenance facility and promotes employee wellbeing and integrates into the surrounding neighborhood. The building incorporates plenty of natural light and is net-zero-energy ready and on track to attain LEED Gold certification.

Natural light played a huge role in the design team’s quest to incorporate the latest research in design for workplace wellbeing. Large skylights above the maintenance area fill the space with natural daylight while large roof vents naturally exhaust heated air. A floor-to-ceiling glazed curtain wall provides natural light and views to operations administrative offices, the control suite, and the operators room and amenities.

 

The site’s narrow dimensions heavily influenced the building’s design and led to the overlapping of some building spaces. Chang Kim photograph.

 

Building – Submitting firm, architect RNL Design Owner Los Angeles County Metropolitan Transportation Authority Structural engineer Nabih Youssef & Associates Structural Engineers MEP engineer Glumac

General Information – Size 70,000 sf Cost $100 million Construction time October 2011 to April 2016 Delivery method Design-bid- build

 

Return to the 2017 Building Team Awards landing page

Related Stories

Building Team Awards | Jun 14, 2017

17 projects earn BD+C's 2017 Building Team Awards

Of the 17 projects, one received a Platinum Award, six received Gold Awards, six received Silver Awards, two received Bronze Awards, and two received Honorable Mentions.

Building Team Awards | Jun 14, 2017

3D-printed office: Office of the Future

Dubai kicks off 3D-printing tech initiative with a novel office project.

Building Team Awards | Jun 14, 2017

A space for all: Lighthouse for the Blind and Visually Impaired

Nonprofit HQ fitout improves functionality, accessibility for blind and low-vision individuals.

Building Team Awards | Jun 13, 2017

Government campus reimagined: Intelligence Community Campus

Building Team converts 1940s campus into a sleek, modern home for U.S. intelligence agencies.

Building Team Awards | Jun 13, 2017

Secluded sanctuary: Alnoba leadership training center

Leadership training center becomes New England’s first Passive House building.

Building Team Awards | Jun 12, 2017

Circles and squares: Faena Arts Center

Silver Award: The Faena Arts Center’s forum is divided into two volumes, one a cylinder, the other a cube.

Building Team Awards | Jun 12, 2017

The right prescription: University of North Dakota School of Medicine & Health Sciences

Silver Award: North Dakota builds a new medical/health sciences school to train and retain more physicians.

Building Team Awards | Jun 12, 2017

Texas technopark: TechnipFMC John T. Gremp Campus

Silver Award: TechnipFMC’s new campus marks the start of a massive planned community in north Houston.

Building Team Awards | Jun 8, 2017

Quick turnaround: Partners HealthCare

Silver Award: A 2½-year project brings Partners HealthCare’s sprawling administrative functions under one roof.

Building Team Awards | Jun 8, 2017

Raising the bar: Zurich North American Headquarters

Silver Award: Forgoing a typical center-core design, the Zurich North America Headquarters rises 11 stories across three stacked bars.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021