flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Measuring whole building energy use among big changes in LEED v4

Measuring whole building energy use among big changes in LEED v4

The prerequisite also requires energy use data to be shared with USGBC.


By BD+C Staff | January 2, 2014

A new prerequisite in LEED v4 calls for each project to measure whole building energy use, and then share that data with USGBC. Other key changes in the latest version of LEED include:

• Two new prerequisites for building-level water metering and outdoor water use reduction.
• Demand response credit requires that the demand response system must be capable of being fully automated, but can be operated in a semi-automated way.
• Renewable energy production credit increases the number of points available for renewable energy.
• Advanced energy metering prerequisite requires a permanent metering system that records intervals of one hour or less, and the meter must transmit that data to a remote location.
• Under the new Building Product Disclosure and Optimization credit, LEED v4 awards points for construction projects that use at least 20 building products that have issued Environmental Product Declarations or Health Product Declarations.

 (http://www.greentechmedia.com/articles/read/5-energy-changes-to-leed-v.4)

Related Stories

Sustainability | Jun 28, 2017

Mohawk College will have one of the region’s first net-zero energy institutional buildings

The project’s net-zero goals led to the development of a new curtain wall system.

Game Changers | Jan 18, 2017

Turning friction into power

Research on piezoelectricity moves closer to practical applications for infrastructure and buildings.

Energy Efficiency | Jan 5, 2017

Exponential growth in net zero energy buildings predicted for the next two decades

Technology and regulations will be the drivers, says Navigant Research.

Sponsored | Energy Efficiency | Dec 20, 2016

Upgrade brings comfort and efficiency to Euclid Chemical

Euclid Chemical upgrades to a dependable and efficient system that will meet their needs for years to come.

Energy Efficiency | Dec 13, 2016

A Massachusetts college now features the largest zero-net-energy academic building in Northeast

Bristol Community College wants to be carbon neutral by 2050.

Sustainability | Sep 19, 2016

Brussels’ Botanic Center apartment block looks to live up to its name with the addition of 10,000 plants and a rooftop “Chrysalis”

The project, which has been commissioned and is in the design phase, would eliminate CO2 and produce its own energy.

Energy | Sep 13, 2016

Oberlin College to hold conference on post-fossil fuel economy

The gathering will address climate change and new sources of energy.

Sustainability | Aug 30, 2016

New federal project plans must include climate impacts

Agencies must quantify the specific impacts when possible.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021