flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Marvel leads restoration and redesign of El Yunque Visitors’ Center

Reconstruction & Renovation

Marvel leads restoration and redesign of El Yunque Visitors’ Center

The project cost $18.1 million.


By David Malone, Managing Editor | January 24, 2022
El Yunque Visitors’ Center exterior
All photos: Joe Colón

Marvel has recently completed the $18.1 million restoration and redesign of the El Yunque Visitor’s Center, "El Portal," located in the Puerto Rican municipality of Rio Grande. Commissioned by the USDA Forest Service, the project is part of the agency’s focus on strengthening the recreation offerings of El Yunque National Forest, The only tropical rainforest in the U.S. National Forest System.

The reconstruction included the addition of a new entry plaza and gardens that welcome visitors to the center. New passive ventilation was integrated at the exhibit, cafe, and multi-use pavilions, accomplished through new roof structures with clerestory windows and new shading structures. Additionally, a new cafe and a commercial and catering kitchen allow for more diverse uses to the Visitor’s Center.

El Yunque Visitor’s Center cafe

Marvel also designed the only accessible trail in the entire National Forest as part of the project. New interpretative exhibits were designed by Split Rock Studios. The reception desk and interior signage at El Portal were custom-designed and built by Puerto Rico Hardwoods with recycled local mahogany boards from the forest.

After sustaining significant damages from Hurricane Maria, the Visitor’s center has been closed since 2017. The project began in the summer of 2019 and completed in December 2021. It officially reopened on January 20, 2022.

El Yunque Visitor’s Center exhibits

El Yunque Visitor’s Center cafe

El Yunque Visitor’s Center exterior path

Related Stories

| Nov 8, 2011

Transforming a landmark coastal resort

Originally built in 1973, the building had received several alterations over the years but the progressive deterioration caused by the harsh salt water environment had never been addressed.

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 12, 2011

First phase of plan to revitalize Florida's Hialeah Park announced

This is the first project of a master plan developed to revive the historic racetrack. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021