flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

The largest dowel laminated timber project in North America begins construction in Des Moines

Wood

The largest dowel laminated timber project in North America begins construction in Des Moines

The building will feature a unique “shou sugi ban” charred wood exterior.


By David Malone, Associate Editor | August 24, 2018
111 East Grand exterior

Courtesy Ryan Companies

111 East Grand, a 66,800-sf, four-story multi-use building, is currently under construction in Des Moines. The building is the largest dowel laminated timber (DLT) project in North America. DLT, manufactured by StructureCraft, will be used for the floor and roof assemblies. The columns and beams will be made from glue laminated timber.

DLT panels are made from stacked softwood lumber boards that are friction-fit together using hardwood dowels. DLT doesn’t contain any glue, VOCs, or metal nails, meaning there is no off-gassing.

 

See Also: First mass timber panel made from structural composite lumber gets APA certification

 

The project is a collaborative development between JSC Properties, Rypma Properties, Christensen Development, and Ryan Companies. In addition to working on the project, Ryan Companies will also be one of the building’s first tenants as the firm will move its Des Moines office team into the project. Three additional tenants have secured leases as well: Neumann Monson Architects (the architect of record for the project), St. Kilda Surf + Turf, and West Financial Advisors.

The project is slated for completion in Spring 2019.

Tags

Related Stories

| Apr 27, 2012

APA launches wood design web portal for building and design pros

Design professionals who are members of APA’s Professional Associates are automatically enrolled in the APA Designers Circle program.

| Apr 26, 2012

Energy efficiency requirements heighten the importance of proper protection for roofing systems

Now more than ever, a well-insulated and well protected roof is critical in new or renovated commercial buildings.

| Apr 16, 2012

Drake joins EYP as science and technology project executive

Drake’s more than 30 years of diversified design and project delivery experience spans a broad range of complex building types.

| Feb 26, 2012

Milwaukee U-Haul facility receives LEED-CI Silver

The new elements of the facility now include: efficient lighting with day-lighting controls and occupancy sensors, a high-efficiency HVAC system used in conjunction with a newly constructed thermal envelope to help reduce energy consumption, and the installation of low-flow fixtures to reduce water consumption.

| Feb 10, 2012

Task force addresses questions regarding visually graded Southern Pine lumber

Answers address transition issues, how to obtain similar load-carrying capabilities, and why only some grades and sizes are affected at this time. 

| Feb 2, 2012

Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012

Winning projects will be featured in the May issue of BD+C. 

| Feb 1, 2012

New ways to work with wood

New products like cross-laminated timber are spurring interest in wood as a structural material.

| Jan 26, 2012

Hendrick Construction completes Osso Restaurant in Charlotte

Designed by François Fossard, Osso's upscale interior includes tapered, twisted decorative columns and an elegant fireplace in the center of the lounge. 

| Dec 20, 2011

BCA’s Best Practices in New Construction available online

This publicly available document is applicable to most building types and distills the long list of guidelines, and longer list of tasks, into easy-to-navigate activities that represent the ideal commissioning process.

boombox1 - default
boombox2 -
native1 -

More In Category


Mass Timber

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021