flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

LA’s Greek Theater restoration completes

Performing Arts Centers

LA’s Greek Theater restoration completes

Page & Turnbull led the project in collaboration with design firm Rios.


By David Malone, Associate Editor | August 17, 2020
The Greek Theatre exterior

All photos by Jim Simmons, courtesy Page & Turnbull

The Greek theatre, a 5,900-seat outdoor music venue in Griffin Park, Los Angeles, has recently completed a restoration project.

The renovation project for the 90-year-old theatre began in 2015 after the Greek Revival-inspired architecture began to lose its historic luster. “Over the years, the site had accumulated a disparate collage of signage, advertisements and additions that obscured the original Neoclassical features,” said Page & Turnbull Architect and Principal John Lesak, AIA, LEED AP, FAPT, in a release. “We focused attention on conserving the iconic patron doors, and restoring the signature green-glazed clay tile roof .”

 

Greek Theatre rooftop and skylight renovations

 

Phases 1 and 2 of the restoration included the removal of alterations to the site that obscured the historic character as well as the complete restoration of the iconic entry gates, which were badly corroded. The project’s final phase focused on the roof and skylights. Only 10% of the original terra cotta roof tile was salvageable, which meant the team had to custom fabricate new tiles using slip-casting and glazing. Existing skylights were restored and updated with high-performance glass and a carbon fiber wrap was added to the concrete roof deck for seismic strengthening.

While the project has completed, visitors will have to wait a while longer before being able to fully appreciate the renovations as the Greek’s 2020 season has been cancelled due to the coronavirus.

 

Greek Theatre entry gates

Related Stories

| Sep 22, 2014

4 keys to effective post-occupancy evaluations

Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.

| Sep 22, 2014

Sound selections: 12 great choices for ceilings and acoustical walls

From metal mesh panels to concealed-suspension ceilings, here's our roundup of the latest acoustical ceiling and wall products. 

| Sep 9, 2014

Using Facebook to transform workplace design

As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.

| Sep 3, 2014

New designation launched to streamline LEED review process

The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.

| Sep 2, 2014

Ranked: Top green building sector AEC firms [2014 Giants 300 Report]

AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms. 

| Aug 25, 2014

Ranked: Top cultural facility sector AEC firms [2014 Giants 300 Report]

Arup, Gensler, and Turner head BD+C's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2014 Giants 300 Report.

| Jul 28, 2014

Reconstruction market benefits from improving economy, new technology [2014 Giants 300 Report]

Following years of fairly lackluster demand for commercial property remodeling, reconstruction revenue is improving, according to the 2014 Giants 300 report.

| Jul 28, 2014

Reconstruction Sector Construction Firms [2014 Giants 300 Report]

Structure Tone, Turner, and Gilbane top Building Design+Construction's 2014 ranking of the largest reconstruction contractor and construction management firms in the U.S.

| Jul 28, 2014

Reconstruction Sector Engineering Firms [2014 Giants 300 Report]

Jacobs, URS, and Wiss, Janney, Elstner top Building Design+Construction's 2014 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.

| Jul 28, 2014

Reconstruction Sector Architecture Firms [2014 Giants 300 Report]

Stantec, HDR, and HOK top Building Design+Construction's 2014 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.

boombox1 - default
boombox2 -
native1 -

More In Category



Performing Arts Centers

Frank Gehry-designed expansion of the Colburn School performing arts center set to break ground

In April, the Colburn School, an institute for music and dance education and performance, will break ground on a 100,000-sf expansion designed by architect Frank Gehry. Located in downtown Los Angeles, the performing arts center will join the neighboring Walt Disney Concert Hall and The Grand by Gehry, forming the largest concentration of Gehry-designed buildings in the world.


Giants 400

Top 35 Performing Arts Center and Concert Venue Construction Firms for 2023

The Whiting-Turner Contracting Company, Holder Construction, McCarthy Holdings, Clark Group, and Gilbane Building Company top BD+C's ranking of the nation's largest performing arts center and concert venue general contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021