flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

KTGY unveils designs for Downtown Superior’s Main Street mixed-use portion

Mixed-Use

KTGY unveils designs for Downtown Superior’s Main Street mixed-use portion

The development will be built in Superior, Colo.


By David Malone, Associate Editor | February 11, 2020
Downtown Superior wrap building

All renderings courtesy KTGY Architecture and Planning

KTGY Architecture and Planning has unveiled the designs for the Main Street mixed-use portion of Downtown Superior. The project will create a walkable 12-acre mixed-use location incorporating residential, commercial, civic, retail, and restaurants.

The mixed-use community has been inspired by the area’s coal mining history and uses a blend of materials including brick and black metal. The designs for the 10 residential, four commercial, and four mixed-use buildings will help establish a sense of place along the new Main Street between Marshall Road and Superior Drive. In total, the buildings will comprise 382 residential units and over 70,000 sf of commercial, retail, and restaurant space.

 

Downtown Superior final podium rendering

 

On the north side of Main Street, a five-story apartment building with structured parking sits adjacent to retail spaces. “The large ‘wrap’ building, which features 76 residential units and commercial retail, will be topped by a 5th story resident clubhouse and pool deck which will have panoramic views of the Flat Irons and the entire Front Range,” said Terry Willis, AIA, LEED AP, KTGY Principal in a release. “The above-grade parking garage in the wrap building provides ultimate convenience both for residents and patrons of the civic functions, retail and restaurants.”

 

See Also: Building sensors: A digital crystal ball

 

A landscaped paseo runs as a central spine between the apartment building and the park-front restaurant, ending on the northern end of the paseo and connecting residential units to the retail plaza. The central plaza will serve as the public town square and open to Main Street, engaging the first-floor commercial uses along its sides. The central plaza is designed to host concerts, markets, and community events.

 

Downtown Superior mixed-use aerial rendering

 

A stand-alone retail building will anchor the plaza at the corner of Superior and Main Street. On the south side of Main Street, two stories of residential sit atop a first-floor commercial space.

Construction will begin in the second quarter of 2020 with the first phase of apartments and retail slated for completion by the end of the summer in 2021. The final phase is anticipated to complete in the second half of 2022.

The overall development plans for Downtown Superior include public sports fields as part of a new 46-acre public park system, offices, hotels, entertainment, civic additional residential, and medical facilities.

Tags

Related Stories

| Aug 11, 2010

New book provides energy efficiency guidance for hotels

Recommendations on achieving 30% energy savings over minimum code requirements are contained in the newly published Advanced Energy Design Guide for Highway Lodging.   The energy savings guidance for design of new hotels provides a first step toward achieving a net-zero-energy building.

| Aug 11, 2010

AGC unveils comprehensive plan to revive the construction industry

The Associated General Contractors of America unveiled a new plan today designed to revive the nation’s construction industry. The plan, “Build Now for the Future: A Blueprint for Economic Growth,” is designed to reverse predictions that construction activity will continue to shrink through 2010, crippling broader economic growth.

| Aug 11, 2010

PCL Construction, HITT Contracting among nation's largest commercial building contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Commercial Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Webcor, Hunt Construction lead the way in mixed-use construction, according to BD+C's Giants 300 report

A ranking of the Top 30 Mixed-Use Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Report: Fraud levels fall for construction industry, but companies still losing $6.4 million on average

The global construction, engineering and infrastructure industry saw a significant decline in fraud activity with companies losing an average of $6.4 million over the last three years, according to the latest edition of the Kroll Annual Global Fraud Report, released today at the Association of Corporate Counsel’s 2009 Annual Meeting in Boston. This new figure represents less than half of last year’s amount of $14.2 million.

| Aug 11, 2010

First CityCenter projects earn LEED Gold

CityCenter announced today that it has received three Leadership in Energy and Environmental Design LEED Gold certifications from the U.S. Green Building Council for: 1) ARIA Resort's hotel tower; 2) ARIA Resort's convention center and theater; 3) Vdara Hotel. ARIA and Vdara will open in December on the Las Vegas Strip and are the first of CityCenter's developments to be LEED certified.

| Aug 11, 2010

And the world's tallest building is…

At more than 2,600 feet high, the Burj Dubai (right) can still lay claim to the title of world's tallest building—although like all other super-tall buildings, its exact height will have to be recalculated now that the Council on Tall Buildings and Urban Habitat (CTBUH) announced a change to its height criteria.

| Aug 11, 2010

Spa resort in harmony with mountain setting

The Sparkling Hill Resort and Wellness Hotel in Vernon, B.C., looks as if it was chiseled out of bedrock and jutting from the mountainside. Designed by the Victoria, B.C., office of Cannon Design, the 240,000-sf resort has 152 guest rooms with floor-to-ceiling windows and spa-like bathrooms, as well as a signature 20,000-sf whole-body wellness spa with treatment rooms designed to feel like they...

| Aug 11, 2010

Triangular tower targets travelers

Chicago-based Goettsch Partners is designing a new mixed-use high-rise for the Chinese city of Dalian, located on the Yellow Sea coast. Developed by Hong Kong-based China Resources Land Limited, the tower will have almost 1.1 million sf, which includes a 377-room Grand Hyatt hotel, 84 apartments, three restaurants, banquet space, and a spa and fitness center.

| Aug 11, 2010

CityCenter projects get LEED Gold

MGM Mirage and Infinity World Development have received LEED Gold certification for the first three CityCenter projects: the ARIA Resort hotel tower, ARIA Resort convention center and theater, and the Vdara Hotel (above). The CityCenter developers anticipate Gold or Silver LEED certification for the project's remaining developments, which include a Mandarin Oriental hotel, a 500,000-sf retail a...

boombox1 - default
boombox2 -
native1 -

More In Category

MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021