Kohn Pedersen Fox Associates (KPF) has officially broken ground on West Lake 66 in Hangzhou, China. The project will form a new elevated green pedestrian link between West Lake and the Grand Canal, two of Hangzhou’s essential landmarks.
The 194,000-sm project includes five office towers with space suited to technology startups and young professionals, a boutique hotel, public parks, and an active, mixed-use podium. KPF parametrically linked shadow impacts, visibility from streets, unobstructed views, maximized daylight, and other key factors in an algorithm that organized optimal massing along the greenway to determine the position of the buildings and the overall site organization.
Plomp for KPF.
See Also: A series of glass ‘igloos’ create the world’s northernmost hotel
The buildings’ facades optimize daylight while the overall project was designed with a modular, fluid porosity that reflects the material heritage of the city and its craftspeople using local materials like terracotta, stone, and wood.
Plomp for KPF.
The podium is designed in sinuous bands of rectangular cells, each one responding to the program within, that tie the site together. The cells can be updated over the lifespan of the building. The podium also stacks a mix of uses to form a layered program that ensures future flexibility. Office space opens to a green roof that spans the length of the podium to create a public sky park.
Plomp for KPF.
Plomp for KPF.
Plomp for KPF.
Jim Keen for KPF.
Related Stories
| Apr 30, 2013
First look: North America's tallest wooden building
The Wood Innovation Design Center (WIDC), Prince George, British Columbia, will exhibit wood as a sustainable building material widely availablearound the globe, and aims to improve the local lumber economy while standing as a testament to new construction possibilities.
| Mar 3, 2013
Hines acquires Archstone's interest in $700 million CityCenterDC project
The Washington D.C. office of Hines, the international real estate firm, announced the acquisition of the ownership interest of their partner, Archstone, in the mixed-use CityCenterDC project that is currently under construction in downtown Washington, D.C.
| Feb 17, 2013
Pakistan to get world's tallest tower in $45 billion deal
Newly signed mega deal will fund construction of several massive developments in Karachi, including a mixed-use tower that will dwarf the Burj Khalifa.
| Jul 12, 2012
EE&K and Knutson Construction selected for the Interchange in Minneapolis
Design-build contract for $79.3 million transportation hub will connect transit with culture.
| Jul 2, 2012
Bernards building mixed-use project in Beverly Hills
The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 23, 2012
Summit Design+Build selected as GC for Chicago restaurant
Little Goat will truly be a multifunctional space. Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.