flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

In Houston, proposed rules would require building above 500-year flood level

Codes and Standards

In Houston, proposed rules would require building above 500-year flood level

Change would impact 85,739 pieces of property.


By Peter Fabris, Contributing Editor | April 5, 2018

City leaders in Houston are considering new floodplain rules that would require buildings to be built above the 500-year flood level.

Houston has experienced three “500-year floods” between 2015 and 2017. The current building code requires buildings to be able to withstand a 100-year flood.

The change would affect 85,739 pieces of property that were not previously in a regulated area. Some Hurricane Harvey victims are concerned that they would be forced to spend hundreds of thousands of dollars to rebuild their homes to the new standards.

Homes already in the rebuilding process, though, may not be affected.

Related Stories

| Dec 22, 2011

AGC’s safety conference Jan. 11-13 in San Antonio

The Associated General Contractors of America’s national meeting for safety and health professionals will take place Jan. 11-13, 2012 in San Antonio, TX.

| Dec 22, 2011

Proposed New York City zoning revamp encourages rooftop solar and wind energy

New zoning regulation proposals to make it easier for building owners in New York City to make their structures more sustainable have entered the public approval process.

| Dec 15, 2011

Dayton, Ohio schools saving $2.6 million annually by building to LEED

On average, green schools save about $100,000 a year on operating costs, including energy and water savings.

| Dec 15, 2011

Building to LEED standards can pose new risks for construction workers

Workers on these projects suffer a 24% increase in falls to lower levels during roof work, which researchers attributed to the installation of solar panels, and a few other risks.

| Dec 15, 2011

NRDC charges Maine governor with weakening green wood requirement

The FSC program is administered through the Leadership in Energy and Environmental Design (LEED) and requires wood to be harvested in a sustainable way.

| Dec 15, 2011

Post-tornado, Tuscaloosa seeks to create walkable urban, retail areas

Block sizes initially were limited to a maximum perimeter of 1,750 feet, with no side of the block being longer than 500 feet.

| Dec 15, 2011

Allentown, Pa. city council asked to repeal union-friendly law

The mayor of Allentown, Pa. asked the City Council to repeal a year-old ordinance that forces contractors to hire union workers for large city projects funded with state and federal dollars.

| Dec 13, 2011

LEED-EB outpaces LEED for new construction

The U.S. Green Building Council's (USGBC's) LEED certifications for existing buildings standard is outpacing LEED for new buildings for the first time.

| Dec 13, 2011

Regulators charge pervasive abuse of construction workers in Connecticut

Federal and state regulators say they have uncovered what they call "widespread noncompliance" with minimum wage and overtime laws in Connecticut's construction industry.

| Dec 13, 2011

Philadelphia mayor signs order for project labor agreements

Philadelphia Mayor Michael Nutter signed an executive order establishing project labor agreements for major public works projects in Philadelphia.

boombox1
boombox2
native1

More In Category

Green

Tool helps construction and renovation projects with CalGreen compliance

One Click LCA recently launched a new software tool to help building teams comply with Part 11, Title 24, of the California Code of Regulations—CALGreen. The regulation is the nation’s first state-mandated green building code to include embodied carbon emission control as a mandatory component, effective from July 1, 2024.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021