flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Hotel and indoor waterpark under construction in the Catskill Mountains

Hotel Facilities

Hotel and indoor waterpark under construction in the Catskill Mountains

The project is slated to open in April.


By David Malone, Associate Editor | March 5, 2019
Kartrite water park under construction

Courtesy Aquatic Development Group

The Kartrite Hotel & Indoor Waterpark is nearing completion in the Catskill Mountains in Upstate New York. The hotel is located next to a 100,000-sf casino and the Monster Golf Course.

The $180-million project will feature 324 guest rooms. Amenities include a bar, a candy store, a coffee shop, four restaurants, a tap room, a family entertainment center with an arcade and indoor ropes course, a conference center, and a spa.

 

Lazy river at kartrite under constructionCourtesy Aquatic Development Group.

 

Connected to the hotel is a four-season, two-acre indoor water park, designed by Aquatic Development Group. The indoor water park, which will become New York’s largest, includes a FlowRider surf attraction, a lazy river, a kids activity pool with basketball, and a multi-level play structure and slides. Deck space with cabanas, landscaping and vegetation, and a mezzanine that overlooks the waterpark with additional seating and a bar & grill restaurant will also be included.

 

See Also: Art-focused hotel will be the first to open in the Dallas Arts District

 

A 60,000-sf Texlon transparent roofing system will cover the entire park and feature column-free construction. The barrel-shaped roof allows sunlight to enter the water park, which will be kept at a steady 84 degrees, year round.

 

Kartrite water park from the exterior under constructionCourtesy Aquatic Development Group.

 

Kartrite water park under constructionCourtesy Aquatic Development Group.

 

Kartrite hotel under constructionCourtesy Aquatic Development Group.

 

Kartrite hotel main building under constructionCourtesy Aquatic Development Group.

 

Kartrite renderingCourtesy Aquatic Development Group.

 

Related Stories

Giants 400 | Aug 21, 2022

Top 110 Architecture/Engineering Firms for 2022

Stantec, HDR, HOK, and Skidmore, Owings & Merrill top the rankings of the nation's largest architecture engineering (AE) firms for nonresidential and multifamily buildings work, as reported in Building Design+Construction's 2022 Giants 400 Report.

Giants 400 | Aug 20, 2022

Top 180 Architecture Firms for 2022

Gensler, Perkins and Will, HKS, and Perkins Eastman top the rankings of the nation's largest architecture firms for nonresidential and multifamily buildings work, as reported in Building Design+Construction's 2022 Giants 400 Report.

Giants 400 | Aug 19, 2022

2022 Giants 400 Report: Tracking the nation's largest architecture, engineering, and construction firms

Now 46 years running, Building Design+Construction's 2022 Giants 400 Report rankings the largest architecture, engineering, and construction firms in the U.S. This year a record 519 AEC firms participated in BD+C's Giants 400 report. The final report includes more than 130 rankings across 25 building sectors and specialty categories. 

Hotel Facilities | Aug 12, 2022

Denver builds the nation’s first carbon-positive hotel

Touted as the nation’s first carbon-positive hotel, Populus recently broke ground in downtown Denver.

Hotel Facilities | Jul 28, 2022

As travel returns, U.S. hotel construction pipeline growth follows

According to the recently released United States Construction Pipeline Trend Report from Lodging Econometrics (LE), the total U.S. construction pipeline stands at 5,220 projects/621,268 rooms at the close of 2022’s second quarter, up 9% Year-Over-Year (YOY) by projects and 4% YOY by rooms.

Hotel Facilities | May 31, 2022

Checking out: Tips for converting hotels to housing

Many building owners are considering repositioning their hotels into another property type, such as senior living communities and rental apartments. Here's advice for getting started. 

Sponsored | Multifamily Housing | May 8, 2022

Choosing the right paver system for rooftop amenity spaces

This AIA course by Hoffmann Architects offers best practices for choosing the right paver system for rooftop amenity spaces in multifamily buildings.

Sponsored | BD+C University Course | May 3, 2022

For glass openings, how big is too big?

Advances in glazing materials and glass building systems offer a seemingly unlimited horizon for not only glass performance, but also for the size and extent of these light, transparent forms. Both for enclosures and for indoor environments, novel products and assemblies allow for more glass and less opaque structure—often in places that previously limited their use.

Hotel Facilities | Apr 25, 2022

U.S. hotel construction pipeline up 2%, with 5,090 projects in the works

The total U.S. hotel construction pipeline stands at 5,090 projects and 606,302 rooms at the end of the first quarter of 2022, up 2% by projects, but down 3% by rooms, according to the Q1 2022 Construction Pipeline Trend Report for the United States from Lodging Econometrics (LE). 

Market Data | Apr 14, 2022

FMI 2022 construction spending forecast: 7% growth despite economic turmoil

Growth will be offset by inflation, supply chain snarls, a shortage of workers, project delays, and economic turmoil caused by international events such as the Russia-Ukraine war.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021