flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

HOK sustainability expert Mary Ann Lazarus tapped by AIA for strategy consulting position

HOK sustainability expert Mary Ann Lazarus tapped by AIA for strategy consulting position

Her new position, which begins March 1, will focus on increasing the AIA's impact on sustainability across the profession.


By HOK | February 25, 2013
HOK sustainability expert Mary Ann Lazarus tapped by AIA for strategy consulting
HOK sustainability expert Mary Ann Lazarus tapped by AIA for strategy consulting position

Mary Ann Lazarus, FAIA, LEED® AP BD+C, has accepted a two-year consulting position with the American Institute of Architects in Washington, DC. Her new position, which begins March 1, will focus on increasing the AIA's impact on sustainability across the profession. The St. Louis-based architect will continue consulting at HOK.

Lazarus, an architect with HOK in St. Louis since 1980, has served as the global firm's director of sustainable design since 2001. She co-authored the second edition of "The HOK Guidebook to Sustainable Design," an influential textbook used by design professionals and universities. Lazarus won Eco-Structure's 2012 Evergreen Award in the Perspectives category, which recognizes one individual each year for advancing sustainable design. In 2011, based on her significant contributions to sustainable design over her career, the AIA elevated Lazarus to its College of Fellows.

"Mary Ann has served as a sustainability teacher and mentor for an entire generation of architects," said HOK President Bill Hellmuth, AIA, LEED AP BD+C. “We are thrilled that she has this opportunity with the AIA and that she will continue to work with us as a consultant. She is an important part of our HOK family."

"I am incredibly proud of HOK's commitment to sustainable design and of what our people have accomplished," said Lazarus. "Our Sustainability Steering Team will continue to keep HOK on the leading edge of innovation in sustainability." The steering team includes Tim Gaidis, LEED AP BD+C, sustainable design leader in HOK's St. Louis office and board member of Sustainable St. Louis.

"Mary Ann has made sustainability central to our culture and practice in St. Louis and all over the world,” said St. Louis Management Principal Rebecca Nolan, IIDA, LEED AP. “As much as we will miss her leadership, we are proud to share her expertise and passion for sustainability with the AIA and our entire profession.”

Lazarus has played a key role in many milestone HOK sustainable projects. In 2010, she led a St. Louis-based project to design Net Zero Court, a prototype for an affordable, zero carbon emissions office building. Since 2011, she has directed HOK's pro bono design team on Project Haiti, a U.S. Green Building Council-sponsored, biomimetic, LEED Platinum, net zero energy orphanage in Port-au-Prince.

HOK's current projects in St. Louis include serving as executive architect for the BJC HealthCare campus renewal project at Washington University Medical Center, executive architect for the Heritage multi-tenant lab and office building in the CORTEX district, architect for the St. Louis Science Center Agricultural Gallery site planning and design, and architect-of-record for the new 200,000-sq.-ft. expansion of the Saint Louis Art Museum.

HOK is a global architectural firm that provides planning and design solutions for high-performance, sustainable buildings and communities. Through its collaborative network of 24 offices worldwide, the firm delivers design excellence and innovation to clients globally. Founded in St. Louis in 1955, HOK's expertise includes architecture, interiors, planning and urban design, engineering, strategic facility planning, consulting, lighting, graphics and construction services. In 2012, DesignIntelligence ranked HOK as the #1 role model for sustainable and high-performance design for the third consecutive year.

Related Stories

Standards | Apr 22, 2024

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.

Building Materials | Apr 22, 2024

Tacoma, Wash., investigating policy to reuse and recycle building materials

Tacoma, Wash., recently initiated a study to find ways to increase building material reuse through deconstruction and salvage. The city council unanimously voted to direct the city manager to investigate deconstruction options and estimate costs. 

Student Housing | Apr 19, 2024

$115 million Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021