flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Hawaiian architecture firm chooses FRP trellis system over traditional materials

Hawaiian architecture firm chooses FRP trellis system over traditional materials

MGA Architecture plans to add five more trellis systems on the neighboring building. 


By By BD+C Staff | March 22, 2012
Strongwells products were used by Plas-Tech Ltd., a Hawaiian fabricator, for an
Strongwells products were used by Plas-Tech Ltd., a Hawaiian fabricator, for an architectural trellis overlooking Waikiki, Hono

Strongwell’s products were used by Plas-Tech Ltd., a Honolulu, Hawaii fabricator, for an architectural trellis overlooking Waikiki, Honolulu, Hawaii. The trellis sits on top of the Waikiki Shopping Plaza located at the center of the city on world-famous Kalakaua Avenue. The retail center is home to over 50 tenants including national brands GUESS and LeSportSac and also a number of local favorites such as Local Motion, Ukulele House, and Higgins Harte International Galleries.

MGA Architecture, Honolulu, Hawaii, specified the design of the trellis to use Strongwell’s EXTREN 2 x 6-½-in. rectangular tubes. Plas-Tech fabricated the trellis components by molding the outrigger beams and assembling and painting. MGA’s design was inspired by the native Hawaiian culture to evoke sensory response and emotional experience while blending in with the overly urban character of modern-day Waikiki. The trellis system was easily installed and both MGA and Plas-Tech are very happy with the finished product. MGA Architecture was so pleased with Strongwell’s FRP structural shapes, they have plans to add five more trellis systems on the neighboring building. They will also use Strongwell components for another future project.

Project Summary: Waikiki Shopping Plaza, Waikiki, Hawaii

BUILDING TEAM
Architect: MGA Architectures
Fabricator: Plas-Tech Ltd.
Product: Strongwell EXTREN 2 x 6-½-in. rectangular tubes

EXTREN is a proprietary combination of fiberglass reinforcements and thermosetting polyester or vinyl ester resin systems. It is produced in more than 100 standard shapes and has a surface veil to protect against glass fibers penetrating the resin surface in service and to increase corrosion and UV resistance. The features of EXTREN include: corrosion resistant, Low Conductivity – thermally and electrically, non-magnetic – electromagnetic transparency, lightweight, high strength, dimensional stability, and low maintenance.

The features of EXTREN include: corrosion resistant, low conductivity – thermally and electrically, non-magnetic – electromagnetic transparency, lightweight, high strength, dimensional stability, and low maintenance.

EXTREN is offered in three series designed for different environments and applications:

  • Series 500 – an all-purpose series utilizing an isophthalic polyester resin system with a UV inhibitor. Series 500 color is Olive Green
  • Series 525 – An all-purpose series utilizing a fire retardant isophthalic polyester resin system with a UV inhibitor. Series 525 color is Slate Gray (plus certain handrail and fixed ladder components in yellow)
  • Series 625 - A premium series both fire retardant and highly corrosion resistant utilizing a vinyl ester resin system with a UV inhibitor. Series 625 color is Beige

For more information, contact Strongwell at 276-645-8000, webmaster@strongwell.com or visit www.strongwell.com. BD+C

Related Stories

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

Urban Planning | Apr 12, 2024

Popular Denver e-bike voucher program aids carbon reduction goals

Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.

Laboratories | Apr 12, 2024

Life science construction completions will peak this year, then drop off substantially

There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.

Multifamily Housing | Apr 12, 2024

Habitat starts leasing Cassidy on Canal, a new luxury rental high-rise in Chicago

New 33-story Class A rental tower, designed by SCB, will offer 343 rental units. 

Student Housing | Apr 12, 2024

Construction begins on Auburn University’s new first-year residence hall

The new first-year residence hall along Auburn University's Haley Concourse.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021