225 Polk, a former Nashville Public Library building, has undergone an adaptive reuse project to become the new HQ for Hastings Architecture. The building also houses the United Talent Agency and space for McAlpine, a residential architecture and interior design firm. Hastings occupies 24,000 sf of the building with space for the team of more than 85 architects, interior designers, and planners.
The building’s facade is composed of Georgia Cherokee marble panels and 16’ tall glass. All of the marble was cleaned, repaired, and/or replaced with new, perfectly matched marble from the original marble quarry. The original terrazzo floor in the lobby was refurbished, as was the terrazzo-clad monumental stair connecting the two main floors. The architectural interventions of the adaptive reuse were limited to a black and white color palette with walnut accents inspired by the original building’s interiors.
The Athenaeum, a 1,500-sf community room is accessible to the public and intended for use by community organizations and non-profit groups located on the first floor off the main lobby. The Athenaeum seats 100 and has standing room for up to 300 people.
See Also: The world’s largest cricket stadium opens
“This structure was built in 1965 to serve the people of Nashville as a public library,” said William Hastings, Partner at Hastings, in a release. “It was important that our design ensured that part of this historic building would remain accessible to the public and provide the community with a gathering place.”
Related Stories
Urban Planning | Jul 19, 2022
The EV charger station market is appealing to investors and developers, large and small
The latest entry, The StackCharge, is designed to make recharging time seem shorter.
Adaptive Reuse | May 18, 2022
An auto plant in Detroit to get a retread as mixed-use housing
Fisher 21 Lofts could be the largest minority-led redevelopment in the city’s history.
Industrial Facilities | Apr 1, 2022
Robust demand strains industrial space supply
JLL’s latest report finds a shift toward much larger buildings nearer urban centers, which fetch higher rents.
Healthcare Facilities | Mar 25, 2022
Health group converts bank building to drive-thru clinic
Edward-Elmhurst Health and JTS Architects had to get creative when turning an American Chartered Bank into a drive-thru clinic for outpatient testing and vaccinations.
Adaptive Reuse | Dec 16, 2021
An adaptive reuse of a historic building in San Francisco was worth the wait
A five-year-long project included extensive restoration.
Adaptive Reuse | Nov 1, 2021
CallisonRTKL explores converting decommissioned cruise ships for housing
The rapid increase in cruise ship decommissioning during the last 18 months has created a unique opportunity to innovate and adapt these large ships.
Multifamily Housing | Oct 21, 2021
Chicago’s historic Lathrop public housing complex gets new life as mixed-income community
A revitalized New Deal–era public housing community in Chicago brings the Garden City movement of yesteryear into the 21st century.
Adaptive Reuse | Aug 25, 2021
The first net-zero hotel in the U.S. is nearing completion in Connecticut
Solar arrays will provide the electricity for the Hotel Marcel, whose name recalls the building’s original designer.
Adaptive Reuse | Aug 13, 2021
Developers are repositioning vacant space as charter schools
Transwestern is working with the National Alliance of Public Charter Schools to provide a turnkey solution.
Hotel Facilities | Jun 18, 2021
Adaptive reuse for hospitality, with Frank Cretella of Landmark Developers
In an exclusive interview for HorizonTV, Landmark Developers' President Frank Cretella talks about the firm's adaptive reuse projects for the hospitality sector. Cretella outlines his company's keys to success in hospitality development, including finding unique properties and creating memorable spaces.