flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Gothic-style dance center breaks ground at University of Southern California

Gothic-style dance center breaks ground at University of Southern California

The Dance Center will be the first new school on the campus in 40 years 


By Pfeiffer Partners Architects  | April 24, 2014
Ground was broken on April 23 for the new Glorya Kaufman International Dance Center on the University of Southern California campus. Named for the donor, philanthropist Glorya Kaufman, the Center will be a home for dance education on the West Coast and the Pacific Rim. The endowment will fund the building and establish a bachelor of fine arts program combining dance instruction with business training and a liberal arts education.
 
Pfeiffer Partners is designing the building for the school, the first new school on the campus in 40 years, beginning with a concept design, a feasibility study and programming. The design team, USC faculty and leadership of the new school are working together to craft a new facility that physically and aesthetically connects to the rest of campus and reflects the University’s master plan goals and aspirations for the new school. The program for the three-story building will include a dance/performance studio, five dance studios, instructional classrooms, performer support spaces, costume storage, and faculty and administrative offices. The project also includes a significant outdoor courtyard in which the campus community can meet, interact and study in an environment that fosters creativity and innovation in teaching and dance. 
 
Prominently located near the Thornton School of Music, on West 34th Street at Watt Way, will function as a key transitional building from the main campus to the future university village being developed across Jefferson Boulevard. The center’s proximity to downtown Los Angeles’ Music Center, where Kaufman has sponsored several dance performances, will strengthen the whole area’s draw as a cultural destination.
 
One primary goal of the design is to achieve a contemporary building that reflects the University’s historic architectural precedents, rooted in Romanesque traditions and Collegiate Gothic style, with authenticity rather than mimicry of the past. Conceptually, the design presents a dynamic, highly contemporary dance facility clothed in tradition. 
 
 
“The building derives its strengths from the principles of traditional Gothic architecture, but is also inspired by Venetian Gothic vernacular. The building’s massing is broken into its components: five major dance studios and a dance performance room, which is expressed in the architecture of the fenestration and hierarchy of forms; large Gothic arched openings introduce generous amounts of natural light into the spaces as well as create monumental openings for major and minor entries into the building. The skin of the building will be Roman brick with large expanses articulated with a diaper pattern. The building’s floor-to-ceiling windows and detailed articulation of precast concrete will extend the richness of the campus’ architectural language to the street for the first time along Jefferson Boulevard,” explains Project Director William Murray, AIA, Principal with Pfeiffer Partners. 
 
 
 
 
 
 
 

Related Stories

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

Giants 400 | Dec 3, 2020

2020 Cultural Facilities Giants: Top architecture, engineering, and construction firms in the U.S. cultural facilities sector

AECOM, Arup, and Populous head BD+C's rankings of the nation's largest cultural facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

Government Buildings | Nov 13, 2020

Tax shortfalls nip government projects in the bud

Federal contracts are proceeding, but states and cities are delaying, deferring, and looking for private investment.

Cultural Facilities | Oct 13, 2020

Thailand’s Elephant Museum reinforces the bond between humans and beasts

The complex, in Surin Province, was built with 480,000 clay bricks.

Libraries | Sep 25, 2020

Major renovation to Providence’s downtown library is completed

The $29 million project adds light and collaborative space to a 67-year-old wing.

Cultural Facilities | Sep 24, 2020

America's 11 most endangered historic places - 2020 list

Annually, this list spotlights important examples of our nation’s architectural and cultural heritage that, without applied action and immediate advocacy, will be destroyed or face irreparable damage.

Giants 400 | Aug 28, 2020

2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.

Cultural Facilities | Jun 19, 2020

A new ULI report chronicles the depaving of America

Fifteen examples of how parks and green spaces emerged from parking lots, garages, and underpasses.

Libraries | Jan 23, 2020

Information or community center: The next generation of libraries must be both

Are libraries still relevant in a digital world?

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021