flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

George Lucas museum design by MAD Architects finally gets green light

Museums

George Lucas museum design by MAD Architects finally gets green light

The project will go ahead with its revised, smaller-scale design.


By Adilla Menayang, Assistant Digital Editor | November 4, 2015
George Lucas museum design by MAD Architects finally gets green light

The museum's site is not far from Soldier Field, home of the Chicago Bears. There was a dispute over the stadium's parking space, which has now been settled. Renderings courtesy of Lucas Museum of Narrative Art

Designboom reports that Chicago’s city council has finally approved the construction of the Lucas Museum of Narrative Art, which was deigned by Ma Yansong’s firm MAD Architects.

The approval came approximately one month after both MAD Architects and Chicago-based Studio Gang Architects, in charge of landscaping, submitted revised versions of the controversial design. The last hurdle for the museum was a dispute with the Chicago Bears, who’s parking lot would be affected by the museum. After a deal with the team was settled, according to the Chicago Sun-Times, the city’s aldermen and alderwomen approved the project without debate.

"The Lucas Museum of Narrative Art will be an incredible addition to chicago’s museum campus,” said Chiacgo’s Mayor Rahm Emanuel in a statement. "The Lucas Museum will join the 56 other museums in Chicago to provide new cultural and educational benefits for generations to come. The new parkland will add more open greenspace that will be enjoyed by residents across the city."

“We are very pleased with the approval by the city council,” Lucas Museum Of Narrative Art President Don Bacigalupi told Designboom. “The [museum] will be a tremendous educational and cultural amenity for all Chicagoans, and a major addition to the city’s vibrant and renowned artistic community. It will also deliver nearly 200,000 square feet of new green space and accessible parkland along the lakefront for all to enjoy. We are excited to move forward with the museum’s construction.”

The project is slated for a 2019 completion.

 

Tags

Related Stories

| Aug 21, 2013

First look: Petersen Automotive Museum's dramatic facelift

One of the world's largest automotive museums unveils plans for a stunning, sculptured metal exterior and cutting-edge interior upgrades. 

| Aug 14, 2013

Green Building Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest green design and construction firms. 

| Jul 29, 2013

2013 Giants 300 Report

The editors of Building Design+Construction magazine present the findings of the annual Giants 300 Report, which ranks the leading firms in the AEC industry.

| Jul 26, 2013

How biomimicry inspired the design of the San Francisco Museum at the Mint

When the city was founded in the 19th century, the San Francisco Bay’s edge and marshland area were just a few hundred feet from where the historic Old Mint building sits today. HOK's design team suggested a design idea that incorporates lessons from the local biome while creating new ways to collect and store water.

| Jul 22, 2013

Cultural Facility Report [2013 Giants 300 Report]

Building Design+Construction's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2013 Giants 300 Report.

| Jul 19, 2013

Reconstruction Sector Engineering Firms [2013 Giants 300 Report]

URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.

| Jul 19, 2013

Reconstruction Sector Architecture Firms [2013 Giants 300 Report]

Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.

| Jul 19, 2013

Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]

Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.

| Jul 2, 2013

LEED v4 gets green light, will launch this fall

The U.S. Green Building Council membership has voted to adopt LEED v4, the next update to the world’s premier green building rating system.

| Jul 1, 2013

Report: Global construction market to reach $15 trillion by 2025

A new report released today forecasts the volume of construction output will grow by more than 70% to $15 trillion worldwide by 2025.

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




Museums

Nebraska’s Joslyn Art Museum to reopen this summer with new Snøhetta-designed pavilion

In Omaha, Neb., the Joslyn Art Museum, which displays art from ancient times to the present, has announced it will reopen on September 10, following the completion of its new 42,000-sf Rhonda & Howard Hawks Pavilion. Designed in collaboration with Snøhetta and Alley Poyner Macchietto Architecture, the Hawks Pavilion is part of a museum overhaul that will expand the gallery space by more than 40%.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021