flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

First rendering of the National Medal of Honor Museum unveiled

Museums

First rendering of the National Medal of Honor Museum unveiled

Rafael Viñoly Architects designed the project.


By David Malone, Associate Editor | October 7, 2020
National Medal of Honor Museum exterior rendering
National Medal of Honor Museum exterior rendering

The first rendering of the National Medal of Honor Museum, which will be located in Arlington, Texas, has been unveiled.

Charlotte Jones, the National Medal of Honor Museum Foundation (NMOHMF) Chairman of the Board and Dallas Cowboys Executive Vice President, National Medal of Honor Museum (NMOHM) President and CEO Joe Daniels, and Mayor Jeff Williams, President of the Arlington Tomorrow Foundation, provided a joint update on the project and released the first architectural rendering of the future Museum. The National Medal of Honor Museum will be dedicated to honoring the 3,507 recipients of the award, which is the United Sates’ highest award for valor in combat.

The design features a steel slab that “floats” above the rest of the structure. It is connected to the spaces below, which feature large expanses of glass overlooking a reflecting pool, by two spiraling pathways.

The museum will offer an experience that draws personal and emotional connections to Medal of Honor recipients and their stories. It will feature permanent interactive experiences and rotating exhibitions. 

The project will also include an education center aimed at youth character development. The Character Development Program, which has been designed by teachers, will provide students with opportunities to explore the concepts of courage, sacrifice, patriotism, citizenship, integrity, and commitment, and how these values can be exemplified in daily life, according to the Medal of Honor Museum’s website.

The National Medal of Honor Museum is scheduled for a 2024 grand opening.

Tags

Related Stories

| Feb 6, 2013

George W. Bush Presidential Center among award-winning roofing projects honored by Sika Sarnafil

Winners of the 2012 Contractor Project of the Year Competition were announced this week by Sika Sarnafil. The annual competition highlights excellence in roofing installation. Roofing contractors are judged based on project complexity, design uniqueness, craftsmanship, and creative problem solving.

| Jun 22, 2012

Golden Gate Bridge Celebrates 75 Years With the Opening of New Bridge Pavilion

With features such as Nichiha's Illumination series panels, super-insulating glass units, and LED lighting, the new Golden Gate Bridge Pavilion not only boasts the bridge's famous international orange, but green sustainability as well  

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

| Mar 29, 2012

Construction completed on Las Vegas’ newest performing arts center

The Smith Center will be the first major multi-purpose performance center in the U.S. to earn Silver LEED certification.

| Mar 5, 2012

Franklin Institute in Philadelphia selects Skanska to construct new pavilion

The building has been designed by SaylorGregg Architects and will apply for LEED Silver certification.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 9, 2011

Lincoln Center Pavilion wins national architecture and engineering award

The project team members include owner Lincoln Center for the Performing Arts, New York; design architect and interior designer of the restaurant, Diller Scofidio + Renfro, New York; executive architect, FXFOWLE, New York; and architect and interior designer of the film center, Rockwell Group, New York; structural engineer Arup (AISC Member), New York; and general contractor Turner Construction Company (AISC Member), New York. 

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




Museums

Nebraska’s Joslyn Art Museum to reopen this summer with new Snøhetta-designed pavilion

In Omaha, Neb., the Joslyn Art Museum, which displays art from ancient times to the present, has announced it will reopen on September 10, following the completion of its new 42,000-sf Rhonda & Howard Hawks Pavilion. Designed in collaboration with Snøhetta and Alley Poyner Macchietto Architecture, the Hawks Pavilion is part of a museum overhaul that will expand the gallery space by more than 40%.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021