flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

CTBUH honors top innovations in skyscraper design

High-rise Construction

CTBUH honors top innovations in skyscraper design

The Holedeck coffer slab system is among the breakthrough technologies and projects recognized by the Council on Tall Buildings and Urban Habitat with Performance and Innovation Awards.


By Adilla Menayang, Assistant Digital Editor | July 13, 2015
Holedeck, construction, concrete, voided slab, skyscraper, high-rise

Winner of the Innovation award, Holedeck, drastically reduces the vertical space needed to house components such as electricity and plumbing. Photo courtesy Holedeck via CTBUH

The Council on Tall Buildings and Urban Habitat named the winners and finalists of its annual Performance and Innovation Awards

Based on judgment by a prestigious panel of experts, Chiefly Tower in Sydney, Australia snagged this year’s Performance Award, while the Innovation Award went to Spanish manufacturer Holedeck.

Take a look at a more in-depth profile of the winning innovations, as well as a list of the finalists:

 

Performance Winner

Chiefly Tower, Sydney, Australia

Kohn Pedersen Fox Associates (Architects) 

WSP Flack + Kurtz (SE)

The 801-foot tower in downtown Sydney was originally completed in 1992, with 1980s technology. An overhaul was commenced in 2008, where the tower’s key building systems and services were updated to achieve a 4.5 star NABERS Energy Rating.

The CTBUH reports that the project realized a savings of 55 percent in electricity consumption, and reduced its greenhouse gas emissions by 55 percent as well.

Because of all these changes, it was given the Performance Award, which recognizes buildings “that have the least environment impact on the urban realm using measured data,” the CTBUH says, adding that “it is increasingly being recognized that the industry needs to focus on actual ‘performance’ rather than ‘best intentions.’”

“The Technical Awards Jury applauded the efforts to update the energy efficiency of this aging building, both to keep the building competitive with newer structures, as well as addressing critical issues surrounding climate change,” CTBUH says in a statement.

“In a sense, the project gave a ‘new and better life’ to an old asset that was growing less competitive in the market place,” added Ashok Raiji, CTBUH Technical Awards juror and Principal and Mechanical Engineer at Arup.

 

Innovation Award

HOLEDECK

Photo courtesy Holedeck via Vimeo

 

The system of voided concrete slabs by the eponymous Spanish manufacturer can be pierced through their thickness by electrical and plumbing systems, which drastically reduces the vertical space needed to house these components.

Reducing the necessary height of each floor also means fewer materials are required to achieve the same floor area as a typical high rise building.

As a result, the system was recognized with the Innovation Award, which focuses on “one special area of innovation within the design construction, or operation of the project, not the building overall,” CTBUH says in a statement.

Holedeck is a simple and elegant way of creating coffer slabs, with holes in the webs. It overcomes one of the main obstacles to the use of coffer slabs, which is that all services usually have to run below the slab rather than in it. It appears to be particularly suitable for light weight long-span floors or where architects and engineers are interested in making better use of the thermal mass of a concrete coffer slab,” noted Technical Awards Jury Chair and Director, Engineering Excellence Group of Laing O’Rourke David Scott. “The jury felt that some of the best innovations come from simple ideas and HOLEDECK could re-energize this form of construction.”

Finalists

Other projects and products that made it to the final round of judging were:

• Façade Access Equipment by Lee Herzog Façade Access Constulting for its work on the Burj Khalifa

• The Tao Chu Yin Yuan tower

• Triagrid Sctructural System 

Related Stories

High-rise Construction | Feb 6, 2017

Flexing their vanity muscles: Some of the world’s tallest buildings have hundreds of feet of non-occupiable space

The amount of the Burj Khalifa’s height that is non-occupiable is taller than most skyscrapers.

Green | Feb 3, 2017

Nanjing Green Towers will be Asia’s first vertical forest

The project will be covered in 1,100 trees and 2,500 cascading plants and shrubs.

Reconstruction & Renovation | Feb 2, 2017

$500 million investment will modernize Chicago’s Willis Tower *Updated*

The project will be the first major renovation in the building’s 43-year history.

High-rise Construction | Feb 1, 2017

Rippled tower from CORE will be first of 10-tower master plan in Mississauga, Ont.

The tower will become the tallest building in what is Canada’s 6th largest city.

High-rise Construction | Jan 31, 2017

Chicago’s West Loop to receive 500-foot apartment tower

The 44-story tower will provide 492 rental units and a retail podium.

High-rise Construction | Jan 27, 2017

Silverstein Properties waffles on what to do with Far West Side property

The company has gone from a two-tower design, to a supertall, and now, supposedly, back to a two-tower design.

High-rise Construction | Jan 26, 2017

Paris tower provides office space and three hotel complexes across its three superimposed volumes

Equipped with hanging gardens and a panoramic viewpoint for its top tier, Jardins de l’Arche Tower will rise in Paris’s La défense business district.

Architects | Jan 24, 2017

Politicians use architectural renderings in bid to sell Chicago’s Thompson Center

The renderings are meant to show the potential of the site located in the heart of the Chicago Loop.

High-rise Construction | Jan 23, 2017

Growth spurt: A record-breaking 128 buildings of 200 meters or taller were completed in 2016

This marks the third consecutive record-breaking year for building completions over 200 meters.

High-rise Construction | Jan 20, 2017

CTBUH’s tall building predictions for 2017

Woodscrapers, the automobile industry's expansion into the tall building development business, and Nairobi's climb toward becoming Africa's skyscraper hub are just a few of the topics CTBUH's 2017 tall building predictions report focuses on.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021