Fenway Center, Boston’s newest mixed-use development, is now under construction adjacent to Fenway Park.
Fenway Center Development LLC, the project’s developer, announced joint venture partners Gerding Edlen, TH Real Estate, and Meredith Management have signed a long-term ground lease with the Massachusetts Department of Transportation for Phase I of Fenway Center.
Rendering courtesy of Fenway Center Development.
Phase I of the new mixed-use development will take two years to complete and will comprise two residential apartment buildings with 312 units, 37,000 sf of ground floor retail, and 200 underground parking spaces. A 12,000-sf air rights deck and landscaped pedestrian walkway over Yawkey Station and between Beacon St. and Yawkey Station is also included.
Fenway Center will replace a large surface parking lot. It’s buildings are arranged so the taller ones are located next to Yawkey Station to serve as an architectural marker and gateway, while the smaller buildings are scaled down in respect to the Audubon Circle neighborhood and Fenway park area.
Rendering courtesy of Fenway Center Development.
Phase I of Fenway Center is slated for completion by the beginning of 2020.
Rendering courtesy of Fenway Center Development.
Related Stories
| Mar 3, 2013
Hines acquires Archstone's interest in $700 million CityCenterDC project
The Washington D.C. office of Hines, the international real estate firm, announced the acquisition of the ownership interest of their partner, Archstone, in the mixed-use CityCenterDC project that is currently under construction in downtown Washington, D.C.
| Feb 17, 2013
Pakistan to get world's tallest tower in $45 billion deal
Newly signed mega deal will fund construction of several massive developments in Karachi, including a mixed-use tower that will dwarf the Burj Khalifa.
| Jul 12, 2012
EE&K and Knutson Construction selected for the Interchange in Minneapolis
Design-build contract for $79.3 million transportation hub will connect transit with culture.
| Jul 2, 2012
Bernards building mixed-use project in Beverly Hills
The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 23, 2012
Summit Design+Build selected as GC for Chicago restaurant
Little Goat will truly be a multifunctional space. Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.