flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Construction begins on new PGA of America Headquarters

Sports and Recreational Facilities

Construction begins on new PGA of America Headquarters

Page is designing the project.


By David Malone, Associate Editor | October 6, 2020
PGA of America Headquarters

Courtesy Page

The PGA of America’s new 106,622-sf headquarters is now under construction on 6.2 acres of the 660-acre PGA Frisco campus. Once completed, the overall campus will include two new championship golf courses, a 500-room Omni Resort, and a golf entertainment district.

The four-story HQ building will be predominantly glass and limestone. It will initially house 150 corporate employees, with three floors of office space, a top floor conference room, and an outdoor terrace lounge space overlooking the driving range and golf course.

The ground floor will serve staff, PGA Members, and guests as a destination for the future of golf. It will include a video studio and an education center. The lobby design will feature a wood wall, sculpted to mimic the contours of a golf course; terrazzo flooring; and an open social stair, with side areas for seating. The front of the building will feature gardens with native plants to welcome visitors.

The project will also include a trophy gallery and indoor training facilities, such as a chipping area, putting green, driving range simulators, and three bays where exterior wall panels open out for hitting to the actual driving range.

The new PGA of America Headquarters is projected to open in the first quarter of 2022. Adolfson & Peterson Construction is the project’s general contractor, Cushman & Wakefield is managing the construction team on behalf of the PGA of America, and Page is the architect.

Related Stories

Giants 400 | Oct 22, 2021

2021 Sports Facilities Giants: Top architecture, engineering, and construction firms in the U.S. sports and recreation facility sector

AECOM, Populous, Kimley-Horn, and HOK top BD+C's rankings of the nation's largest sports and recreation facility sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.

Arenas | Sep 20, 2021

LA Clippers unveil $1.8 billion Intuit Dome

AECOM is the lead designer for the project.

Sports and Recreational Facilities | Sep 15, 2021

Aston Martin breaks ground on new F1 headquarters

The project is located in Northamptonshire.

Giants 400 | Aug 30, 2021

2021 Giants 400 Report: Ranking the largest architecture, engineering, and construction firms in the U.S.

The 2021 Giants 400 Report includes more than 130 rankings across 25 building sectors and specialty categories.

Sports and Recreational Facilities | Aug 25, 2021

The rise of entertainment districts and the inside-out stadium

Fiserv Forum, home to the 2021 NBA Champion Milwaukee Bucks, proved that the design of the space outside a stadium is just as important as inside.

Resiliency | Aug 19, 2021

White paper outlines cost-effective flood protection approaches for building owners

A new white paper from Walter P Moore offers an in-depth review of the flood protection process and proven approaches.

Sports and Recreational Facilities | Aug 18, 2021

Populous’ design takes center stage for MLB’s Field of Dreams game

The movie-inspired ballpark is located in Dyersville, Iowa.

Sports and Recreational Facilities | Aug 5, 2021

Austin FC’s Q2 Stadium completes

Gensler designed the project.

boombox1 - default
boombox2 -
native1 -

More In Category


Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021