flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Chipperfield's sparkling brass-clad scheme selected to be new home of Nobel Prize

Chipperfield's sparkling brass-clad scheme selected to be new home of Nobel Prize

The distinctive building, with its shimmering vertical brass elements and glass façade design, beat out two other finalists in the Nobel Center architectural competition.


By Nobel Center | April 15, 2014
David Chipperfield Architects has won the Nobel Center architectural competition
David Chipperfield Architects has won the Nobel Center architectural competition. Renderings: courtesy Nobel Center, David Chipp
A unanimous competition jury has selected David Chipperfield’s and Christoph Felger’s slender brass-clad building as the winner in the Nobel Center architectural competition. 
 
“We are extremely excited and honoured to have been selected to be the architects for the Nobel Center. We look forward to working together to develop a building that reflects both the values of the Nobel Prize and the high expectations of the citizens of Stockholm,” says architect David Chipperfield.
 
According to the statement of the jury, the proposed building has an elegant, timeless and attractive external appearance with a clear identity of its own. The revised façade design, with its shimmering vertical brass elements and glass, has a lofty elegance and quality that can be associated with the Nobel Prize.
 
“The jury finds the lightness and openness of the building very appealing and consistent with the Nobel Foundation’s explicit ambition to create an open and welcoming Center for the general public,” says Lars Heikensten, chairman of the competition jury and Executive Director of the Nobel Foundation.
 
The transparent ground floor helps create a pleasant setting in the immediate vicinity of the building, thereby also enriching the urban public space. Meanwhile the building’s moderate footprint creates good opportunities for a public city park in a sunny south-east position.
 
The jury is of the opinion that after additional refinement in collaboration with the client and with public authorities, the proposal can lead to a dignified, exciting and inviting Nobel Center building while helping create a better, more engaging and beautiful urban setting on the Blasieholmen peninsula in central Stockholm.
 
Per Wästberg, writer, member of the Swedish Academy, Chairman of the Nobel Committee for Literature and one of the members of the competition jury says, “We view the winning proposal as a concrete interpretation of the Nobel Prize as Sweden’s most important symbol in the world. Stockholm will gain a building – magnificent but without pomp, powerful yet graceful – with qualities like those the City Hall gave the capital a century ago.”
 
In the now-completed second stage of the competition, the jury assessed proposals from three finalists: David Chipperfield and Christoph Felger från David Chipperfield Architects Berlin (Germany), Johan Celsing from Johan Celsing Arkitektkontor (Sweden) and Gert Wingårdh from Wingårdh Arkitektkontor (Sweden).
 
The Nobel Center will build up its activities around the Nobel Prize’s unique combination of disciplines – sciences, literature and peace. The ambition is to make the Nobel Center one of Stockholm’s most attractive destinations, including public spaces for exhibitions, programme and school activities, events and interdisciplinary meetings of various kinds.
 
Take a look at the renderings that won the competition:
 
©David Chipperfield Architects
 
 
 
©David Chipperfield Architects
 
 
 
©David Chipperfield Architects
 
 
 
©David Chipperfield Architects
 
 
 
©David Chipperfield Architects
 
 
 
©David Chipperfield Architects
 
 
 
©David Chipperfield Architects

Related Stories

Affordable Housing | Mar 11, 2024

Los Angeles’s streamlined approval policies leading to boom in affordable housing plans

Since December 2022, Los Angeles’s planning department has received plans for more than 13,770 affordable units. The number of units put in the approval pipeline in roughly one year is just below the total number of affordable units approved in Los Angeles in 2020, 2021, and 2022 combined.

BIM and Information Technology | Mar 11, 2024

BIM at LOD400: Why Level of Development 400 matters for design and virtual construction

As construction projects grow more complex, producing a building information model at Level of Development 400 (LOD400) can accelerate schedules, increase savings, and reduce risk, writes Stephen E. Blumenbaum, PE, SE, Walter P Moore's Director of Construction Engineering.

AEC Tech | Mar 9, 2024

9 steps for implementing digital transformation in your AEC business

Regardless of a businesses size and type, digital solutions like workflow automation software, AI-based analytics, and integrations can significantly enhance efficiency, productivity, and competitiveness.

Office Buildings | Mar 8, 2024

Conference room design for the hybrid era

Sam Griesgraber, Senior Interior Designer, BWBR, shares considerations for conference room design in the era of hybrid work.

Architects | Mar 8, 2024

98 architects elevated to AIA's College of Fellows in 2024

The American Institute of Architects (AIA) is elevating 96 member-architects and 2 non-member-architects to its College of Fellows, an honor awarded to architects who have made significant contributions to the profession. The fellowship program was developed to elevate architects who have achieved a standard of excellence in the profession and made a significant contribution to architecture and society on a national level. 

Sports and Recreational Facilities | Mar 7, 2024

Bjarke Ingels’ design for the Oakland A’s new Las Vegas ballpark resembles ‘a spherical armadillo’

Designed by Bjarke Ingels Group (BIG) in collaboration with HNTB, the new ballpark for the Oakland Athletics Major League Baseball team will be located on the Las Vegas Strip and offer panoramic views of the city skyline. The 33,000-capacity covered, climate-controlled stadium will sit on nine acres on Las Vegas Boulevard. 

Adaptive Reuse | Mar 7, 2024

3 key considerations when converting a warehouse to a laboratory

Does your warehouse facility fit the profile for a successful laboratory conversion that can demand higher rents and lower vacancy rates? Here are three important considerations to factor before proceeding. 

Shopping Centers | Mar 7, 2024

How shopping centers can foster strong community connections

In today's retail landscape, shopping centers are evolving beyond mere shopping destinations to become vibrant hubs of community life. Here are three strategies from Nadel Architecture + Planning for creating strong local connections. 

Market Data | Mar 6, 2024

Nonresidential construction spending slips 0.4% in January

National nonresidential construction spending decreased 0.4% in January, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau. On a seasonally adjusted annualized basis, nonresidential spending totaled $1.190 trillion.

MFPRO+ Research | Mar 6, 2024

Top 10 trends in senior living facilities for 2024

The 65-and-over population is growing faster than any other age group. Architects, engineers, and contractors are coming up with creative senior housing solutions to better serve this burgeoning cohort. 

boombox1 - default
boombox2 -
native1 -

More In Category


Mass Timber

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021