flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

CBRE completes acquisition of Heery International

Contractors

CBRE completes acquisition of Heery International

The deal is expected to expand the real-estate firm’s project management capacities in several U.S. sectors.


By John Caulfield, Senior Editor | November 13, 2017

As part of the new North Terminal Design project at Miami International Airport, Heery International designed new restaurant and retail spaces ranging from 1,500 to 10,000 sf. Aviation is one of the specialties that Heery is bringing to its new owner, CBRE Group. Image: Heery International

Balfour Beatty, the U.K.-based construction company, continued its strategy of selling off non-core assets with its recent sale of Atlanta-based design services and project management firm Heery International to a subsidiary of the real estate and consulting giant CBRE Group.

The October 30 acquisition, for which CBRE agreed to pay an estimated $57 million (42 million British pounds) in cash, was completed today.

Heery was founded in 1952. Balfour Beatty bought a 50% stake in Heery in 1986, and increased its holding to 100% four years later. However, that ownership sometimes precluded Balfour from acting as a project manager and bidding as a GC simultaneously on certain projects in the U.S. Heery’s sale to CBRE removes any conflict of interest from Balfour’s U.S. Buildings operations, and allows it to partner with Heery on future projects.

In 2016, the latest year for which results are available, Heery International had gross assets valued at the equivalent of $106.1 million, and generated pretax profit the equivalent of $3.2 million. It currently operates from 19 U.S. offices with 535 employees. Its services include project management, architecture, engineering, interior design, and commissioning.

CBRE maintains the largest network of professional commercial real estate project managers worldwide. Its more than 5,000 specialists, including 350-plus LEED-certified professionals, oversaw projects with a total contract value of more than $42 billion worldwide in 2016.

 

In a joint venture with H.J. Russell, Heery provided construction management services for Phase I of the Atlanta-Fulton Public Library System's capital improvement program, which entailed eight new libraries (155,000 sf) and two expanded libraries (81,000 sf). Image: Heery International

 

Mike Lafitte, CBRE’s Global Group President-Lines of Business, states that this acquisition should advance his company’s strategy to expand its project management expertise. “Heery has a strong track record of client service with many longstanding relationships spanning decades,“ he says. Lafitte points specifically to Heery’s relationships in the public and educational sectors. This acquisition will also extend CBRE’s reach into such vertical segments as aviation and sports, and add capabilities and expertise in design engineering services.

Ted Sak and Glenn Jardine, Heery’s President/CEO and Executive VP/COO, respectively, will continue to lead Heery under CBRE’s umbrella. 

Related Stories

Office Buildings | Mar 21, 2024

BOMA updates floor measurement standard for office buildings

The Building Owners and Managers Association (BOMA) International has released its latest floor measurement standard for office buildings, BOMA 2024 for Office Buildings – ANSI/BOMA Z65.1-2024.

Healthcare Facilities | Mar 18, 2024

A modular construction solution to the mental healthcare crisis

Maria Ionescu, Senior Medical Planner, Stantec, shares a tested solution for the overburdened emergency department: Modular hub-and-spoke design.

Codes and Standards | Mar 18, 2024

New urban stormwater policies treat rainwater as a resource

U.S. cities are revamping how they handle stormwater to reduce flooding and capture rainfall and recharge aquifers. New policies reflect a change in mindset from treating stormwater as a nuisance to be quickly diverted away to capturing it as a resource.

Plumbing | Mar 18, 2024

EPA to revise criteria for WaterSense faucets and faucet accessories

The U.S. Environmental Protection Agency (EPA) plans to revise its criteria for faucets and faucet accessories to earn the WaterSense label. The specification launched in 2007; since then, most faucets now sold in the U.S. meet or exceed the current WaterSense maximum flow rate of 1.5 gallons per minute (gpm). 

MFPRO+ New Projects | Mar 18, 2024

Luxury apartments in New York restore and renovate a century-old residential building

COOKFOX Architects has completed a luxury apartment building at 378 West End Avenue in New York City. The project restored and renovated the original residence built in 1915, while extending a new structure east on West 78th Street. 

Construction Costs | Mar 15, 2024

Retail center construction costs for 2024

Data from Gordian shows the most recent costs per square foot for restaurants, social clubs, one-story department stores, retail stores and movie theaters in select cities.

Healthcare Facilities | Mar 15, 2024

First comprehensive cancer hospital in Dubai to host specialized multidisciplinary care

Stantec was selected to lead the design team for the Hamdan Bin Rashid Cancer Hospital, Dubai’s first integrated, comprehensive cancer hospital. Named in honor of the late Sheikh Hamdan Bin Rashid Al Maktoum, the hospital is scheduled to open to patients in 2026.

Codes and Standards | Mar 15, 2024

Technical brief addresses the impact of construction-generated moisture on commercial roofing systems

A new technical brief from SPRI, the trade association representing the manufacturers of single-ply roofing systems and related component materials, addresses construction-generated moisture and its impact on commercial roofing systems.

Sports and Recreational Facilities | Mar 14, 2024

First-of-its-kind sports and rehabilitation clinic combines training gym and healing spa

Parker Performance Institute in Frisco, Texas, is billed as a first-of-its-kind sports and rehabilitation clinic where students, specialized clinicians, and chiropractic professionals apply neuroscience to physical rehabilitation. 

Market Data | Mar 14, 2024

Download BD+C's March 2024 Market Intelligence Report

U.S. construction spending on buildings-related work rose 1.4% in January, but project teams continue to face headwinds related to inflation, interest rates, and supply chain issues, according to Building Design+Construction's March 2024 Market Intelligence Report (free PDF download). 

boombox1 - default
boombox2 -
native1 -

More In Category




MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021