Engineers

Engineering goes hand-in-hand with design, putting a practical lens on the architect’s vision and finding the best way to make it happen. Without a talented engineer, the project will never reach completion, and certainly will not reach the standards of functionality and sustainability that the architect and client are seeking.
October 07, 2011 | By BD+C Staff

 

White paper defines EPD, details development process, and identifies emerging trends for...

read more
October 07, 2011 | By BD+C Staff

The energy-efficient NCE escalator from Otis offers customers substantial “green” benefits.

October 07, 2011 | By BD+C Staff

 

The panels allow interior lights to filter through, from inside. 

October 07, 2011 | By BD+C Staff

Green jobs are already an important part of the construction labor workforce, and signs are that...

read more
October 07, 2011 | By BD+C Staff

Modular Design Architecture >Dow Corning 758 sealant used in GreenZone modular high-performanc...

read more
October 07, 2011 | By BD+C Staff

 

Tridel teams up with Cisco and Control4 to unveil the future of green condo living in Ca...

read more
October 06, 2011 | By BD+C Staff

Panoptix combines latest technology, new business model and industry-leading expertise to make bu...

read more
October 06, 2011 | By BD+C Staff

Interactive modeling software transforms the design­build process. 

October 06, 2011 | By BD+C Staff

There is now a call for making enhanced resilience of a building’s structure to natural and man-m...

read more
October 06, 2011 | By BD+C Staff

Turnkey systems create an aesthetic architectural power plant. 

October 06, 2011 | By BD+C Staff

The cover features a specially designed EPDM finger-type gasket that ensures a positive seal with...

read more
October 05, 2011 | By BD+C Staff

Click here for the latest news and products from Greenbuild 2011, Oct. 4-7, in Toronto.

October 05, 2011 | By BD+C Staff

Researchers at the Massachusetts Institute of Technology’s (MIT) Concrete Sustainability Hub cond...

read more
October 05, 2011 | By BD+C Staff

Products include rubber flooring tiles, treads, wall bases, and more. 

October 05, 2011 | By BD+C Staff

Low insulation value reflects value of entire curtain-wall system. 

October 03, 2011 | By BD+C Staff

The facility, a modification of similar facilities used by Mitsubishi Heavy Industries, Inc. (MHI...

read more
October 03, 2011 | By BD+C Staff

Cauceglia is responsible for developing new global business strategies and expanding existing bus...

read more
September 30, 2011 | By BD+C Staff

The new structure serves as the cemetery's focal architectural point and center of operations.  ...

September 30, 2011 | By BD+C Staff

This new program offers a system for members to purchase annual licenses in order to offer electr...

read more
September 29, 2011 | By BD+C Staff

Profiles of Great Solutions will appear in December 2011 issue of Building Design+Construction....

September 29, 2011 | By BD+C Staff

With a total development cost of $57 million, B.E.S.T. is the first on-campus residence hall cons...

read more
September 29, 2011 | By BD+C Staff

Modular Architecture > In a quest to create the ultimate ‘green’ house, 20 collegiate teams co...

read more
September 23, 2011 | By BD+C Staff

On the heels of a period of weakness in design activity, the Architecture Billings Index (ABI) to...

read more
September 23, 2011 | By BD+C Staff

Building Design+Construction’s Under 40 Leadership Summit...

read more
September 16, 2011 | By BD+C Staff

The facility was renovated in order to better the working environment for DMV employees and strea...

read more
September 14, 2011 | By BD+C Staff

The Los Angeles Chapter of the nonprofit USGBC will launch its Sustainable Innovation Awards this...

read more
September 12, 2011 | By Jeff Yoders, Contributing Editor

 

The Los Angeles Community College District requires every design-build team in its massi...

read more
September 07, 2011 | By BD+C Staff

The project was one of three to win the award in the category of Architectural/Non-Residential. ...

September 06, 2011 | By BD+C Staff

The 108 floor mixed-use skyscraper consists of offices, apartments, hotels and shopping malls on...

read more
July 21, 2011 | Jeff Yoders, Contributing Editor

A new tablet device for construction professionals puts 3D data at the fingertips of project mana...

read more
Overlay Init