Architects

Every building starts with a concept and a design. Architects are involved at every stage of the process, even after a design has been finalized, helping other building team members through the snares and missteps in the construction process.
Total design, construction and fit-out for the building addition will generate 1
March 05, 2012 | By BD+C Staff

The building has been designed by SaylorGregg Architects and will apply for LEED Silver certifica...

read more
1,000 - Approximate number of questions in the Modern Architecture game by NEXT
March 02, 2012 | By Tim Gregorski, Senior Editor

66 skyscrapers to built in China over six years; 1,000 questions in the Modern Architecture game;...

read more
Geo-tagged image shows the exact spot where the photo was taken (red dot) and th
March 01, 2012 | By Ryan Abbott, SUNDT Construction, Inc.

Our expert tells how to organize construction progress photos so you don’t lose track of all the...

read more
The use of light load-bearing glass to create transparent stairs, floors, and ot
March 01, 2012 | By C.C. Sullivan, contributing editor

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online e...

read more
The buildings rugged history of service is captured in the reused building mate
March 01, 2012 | By Leslie Streicher, Associate Editor

The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED...

read more
March 01, 2012 | By BD+C Staff

Aragon constructed the space in partnership with Milo Kleinberg Design Associates, (MKDA) and the...

read more
Bomel Construction Co. and IPD designed and built two adjoining garages, a socce
March 01, 2012 | By BD+C Staff

The $24-million facility, which fits into a canyon setting on the university’s East Campus, inclu...

read more
March 01, 2012 | By BD+C Staff

Eldco hires Peterson and Vivoda as senior project managers.

Plans for the residential floors convert the space from double loaded corridors
March 01, 2012 | By BD+C Staff

Withee Malcolm Architects’ designs for the project include the complete renovation of the Dunbar...

read more
February 29, 2012 | By BD+C Staff

Castillo will oversee projects with new and existing clients in northern California within the ar...

read more
February 29, 2012 | By BD+C Staff

The report analyzes the opportunities for BIPV glass products using c-Si, thin-film and OPV/DSC m...

read more
The Keller Army Community Hospital Clinic at the United States Military Academy
February 29, 2012 | By BD+C Staff

The 51,000 square foot addition will become the home for optometry, ophthalmology, physical thera...

read more
Shaun Carvalho
February 29, 2012 | By BD+C Staff

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including S...

read more
February 29, 2012 | By BD+C Staff

The firm was selected because of their past experience in designing clinically complex facilities...

read more
February 28, 2012 | By BD+C Staff

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, en...

read more
February 28, 2012 | By BD+C Staff

This recognition, highlighting sustainable performances within the construction industry, looks t...

read more
A rendering of the new 122,000-sf Library & Learning Commons at Salem State Univ
February 28, 2012 | By BD+C Staff

When it opens to students in the fall of 2013, the $60 million facility will offer new archival s...

read more
February 28, 2012 | By BD+C Staff

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizati...

read more
The phase two, 13,500-square-foot addition was performed by McCarthy on a compac
February 28, 2012 | By BD+C Staff

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, t...

read more
February 28, 2012 | By BD+C Staff

Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer prod...

read more
Griffin Electric performed the installation of a 15KV service and switches, as w
February 28, 2012 | By BD+C Staff

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office ar...

read more
The 25,600-sf three-story building, which houses the worlds first microbial sin
February 27, 2012 | By BD+C Staff

Designed by WBRC Architects Engineers in association with Perkins + Will.

February 27, 2012 | By BD+C Staff

Intricate interior project involved construction of more than 80 offices.

Opened in December 2010, the 13-story NRI facility was designed and constructed
February 27, 2012 | By BD+C Staff

Innovative and sustainable design reflects best environmental building practices.

February 26, 2012 | By BD+C Staff

The new elements of the facility now include: efficient lighting with day-lighting controls and o...

read more
February 26, 2012 | By BD+C Staff

Space leased by U.S. General Service Administration.

February 26, 2012 | By BD+C Staff

Chen works closely with property owners to ensure that their properties meet and exceed all indus...

read more
February 24, 2012 | By BD+C Staff

The AIA reported the January ABI score was 50.9, following a mark of 51.0 in December.

Larry Lord
February 24, 2012 | By BD+C Staff

A founding partner at Lord, Aeck & Sargent, Lord is nationally renowned for his leadership in...

read more
February 24, 2012 | By BD+C Staff

Pottorff is recognized in the justice field as an expert solely dedicated to the design and plann...

read more
Overlay Init