Get vegetative roof installation right, to avoid costly repairs later

March 16, 2011 |
Drew Ballensky

Proper installation is critical to green (vegetative) roofs because fixing problems later can be costly. “If the roof begins to leak, it means a costly disassembling of the vegetative layer, moisture retainers, and water flow base just to get to the roof membrane to check for faulty seams and other penetration points,” says Dan O’Donnell, president of the United Union of Roofers, Waterproofers & Allied Workers Local in St. Louis. O’Donnell says it is wise to test the roof membrane for leaks by plugging the drains and flooding the roof with water before adding soil and vegetation. http://www.stltoday.com/business/local/article_31fb5daa-521a-5222-9f3c-b...

A crucial factor before installation is ensuring that the roof can support the weight of soil, plants, and the water that they retain. Vegetative roofs use engineered light-weight soil. The weight on the roof depends on the depth of the soil, the types of plants, and the volume of water it holds. When saturated with water, a green roof can add as much as 36 pounds per square foot to the roof’s overall weight, O’Donnell says. “The American Society for Testing and Materials has standards for dead loads on green roofs, which in some cases require a reinforced concrete deck,” he adds.

Drew Ballensky | Reconstruction Blog

Drew Ballensky is general manager of Duro-Last Roofing, Inc.’s central U.S. facility in Iowa and company spokesman for Duro-Last’s cool roofing, sustainability and architectural education programs. He is past-president of the Chemical Fabrics and Film Association and chairman of CFFA’s Vinyl Roofing Division. Drew earned his bachelor’s degree in industrial technology from the University of Northern Iowa and master’s degree in business administration from Florida State University.
Drew has over 29 years experience in business and industry in various engineering and managerial capacities. He has worked in the U.S. and Canadian operations for a major international manufacturer of pre-engineered steel buildings, was a financial analyst with a major athletic apparel manufacturer and was an owner of a general contracting company.

Related Blogs

Wikipedia

January 14, 2014 | Reconstruction Blog

A remembrance area and a new visitor's entrance will be among the changes when the Navy rebuilds Building 1...

Photo: Digidreamgrafix; FreeDigitalPhotos.net

January 06, 2014 | Reconstruction Blog

Reducing energy consumption through energy-efficiency retrofits represents an underappreciated way to cut h...

January 02, 2014 | Reconstruction Blog

San Vicente Inn, a cluster of century-old historic bungalows, known as a haven for nudists and drug users,...

December 27, 2013 | Reconstruction Blog

Rings of scaffolding will start to rise this spring around the cast-iron dome of the U.S. Capitol in Washin...

December 16, 2013 | Reconstruction Blog

Minneapolis’s Northwestern Building, originally built in 1914 as a glass factory, is undergoing a major ren...

December 09, 2013 | Reconstruction Blog

Bethlehem, Pa., is a recipient of a 2013 award by Preservation Pennsylvania for a renovation of the oldest...

Photo: Welton Structural Design

December 02, 2013 | Reconstruction Blog

A $47.6 million overhaul of the Huntington Federal Building in Huntington, West Virginia, includes altered...

November 25, 2013 | Reconstruction Blog

The redevelopment of Fort Monmouth, a former New Jersey army base, is likely to be revised on a building-by...

November 18, 2013 | Reconstruction Blog

Key office design trends such as downsizing of overall space, more open floor plans, and the inclusion of m...

November 11, 2013 | Reconstruction Blog

Salzburg, Austria’s Central Station remained in operation during reconstruction, a feat that required compl...

 

Add new comment

Your Information
Your Comment

Filtered HTML

  • Web page addresses and e-mail addresses turn into links automatically.
  • Allowed HTML tags: <a> <em> <strong> <cite> <blockquote> <code> <ul> <ol> <li> <dl> <dt> <dd>
  • Lines and paragraphs break automatically.

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
Refresh Type the characters you see in this picture. Type the characters you see in the picture; if you can't read them, submit the form and a new image will be generated. Not case sensitive.  Switch to audio verification.
Overlay Init