flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Big police academy trains thousands of New York's finest

Building Team Awards

Big police academy trains thousands of New York's finest

The Police Training Academy in Queens, N.Y., consists of a 480,000-sf academic/administration building and a 240,000-sf physical training facility, linked by an aerial pedestrian bridge.


By Robert Cassidy, Executive Editor | May 27, 2016

A mock environment at the NYC Police Training Academy mimics a subway station, minus the grime. Photo: Eric Laignel/Eric Laignel Photography. Click here to enlarge.

They don’t call New York the Big Apple for nothing. Its new Police Training Academy is Big Apple big. At 720,000 sf, the academy can train two thousand recruits and law enforcement personnel at a time. It is arguably the most advanced self-contained facility of its kind in the world.

The 480,000-sf academic/administration building (classrooms, library, admin/faculty offices) is linked via an aerial pedestrian bridge to the 240,000-sf physical training facility (running track, tactical gymnasium, scuba pool, mock situation environments), a central utility plant, and a muster court.

BRONZE AWARD
New York City Police Training Academy
Queens, N.Y.

The joint venture CM of Turner Construction/STV had to build on a 35-acre city landfill in the College Point section of Queens, near LaGuardia Airport. This led to one of the most stringent environmental compliance efforts ever for a public facility in the city. Decades of household, industrial, and commercial waste had to be dug up and remediated. The entire infrastructure was propped up above the 100-year flood plain so that it could remain operational under extreme weather conditions. The project earned LEED Gold certification.

The project required 65 prime contractors and more than 300 subcontractors. To manage all this, the NYC Department of Design and Construction set up an integrated project office for 100 stakeholders. “Zones of expertise” were formed to enable disciplinary leaders—architecture, structural engineering, interior design, etc.—to communicate readily and make timely decisions. This enabled the Building Team to start work on the foundation and order almost 9,000 tons of structural steel before designs were 100% finalized. It was the first time the NYCDDC had ever used a “big room” on a project, and it worked.

 

In the night view of the main building, the LED light sculpture in the atrium is by Erwin Redl. Photo: Ed Hueber/Archphoto. Click to enlarge.

 

BUILDING TEAM

+Submitting firm: Turner Construction Co./STV Joint Venture (CM)
+Owner: New York City Department of Design and Construction
+Architect: Perkins+Will, with Michael Fieldman Consulting Architects
+Structural: Robert Silman Associates; Guy Nordenson and Associates Structural Engineers; Weidlinger Associates
+Civil, geotechnical consultant: Langan Engineering and Environmental Services
+MEP: WSP Global
+Interior storefront systems consultant: Permasteelisa
+Lighting consultants: Bartenbach; Hillman Dibernardo & Associates
+Land use review consultant: FXFOWLE Architects
+Landscaping consultants: Balmori Associates; HMWhite

GENERAL INFORMATION

Project size: 720,000 sf
Construction cost: confidential at client’s request 
Construction period: December 2009 to 
December 2015
Delivery method: Design-bid-build

Related Stories

Building Team Awards | Nov 2, 2020

Fans come first at Allianz Field

The new home of the Minnesota United soccer club wins a Silver Award in BD+C’s 2020 Building Team Awards. 

Building Team Awards | Oct 24, 2020

Emory University Student Center wins the top award in 2020 Building Team Awards

Emory University Student Center wins the top award in 2020 Building Team Awards

Building Team Awards | Oct 22, 2020

Look up to the skies

The Mori Hosseini Student Union at Embry-Riddle Aeronautical University takes home a Silver Award in the 2020 Building Team Awards.

Building Team Awards | Oct 22, 2020

Judging a book by its cover

The New York Presbyterian David H. Koch Center wins a Silver Award in BD+C’s 2020 Building Team Awards.

Building Team Awards | Oct 21, 2020

Big Room equals big results

Tucson’s Banner University Medical Center is honored with a Gold Award in the 2020 Building Team Awards. 

Building Team Awards | Oct 21, 2020

New York’s STEM epicenter and career gateway

The CUNY New York City College of Technology Academic Building wins a Gold Award in BD+C’s 2020 Building Team Awards. 

Building Team Awards | Oct 20, 2020

Seamless speed to market drives Texas hospital’s growth

Learn why the Methodist Richardson Medical Center Vertical Expansion, in Richardson, Texas, was honored with a Gold Award in the 2020 Building Team Awards.

Building Team Awards | Oct 20, 2020

Winning with teamwork

The new home of the NBA’s Golden State Warriors, Chase Center, is honored with a Gold Award in the 2020 Building Team Awards.

Coronavirus | Oct 8, 2020

The Weekly show: Statue of Liberty Museum, emotional learning in K-12, LA's climate change vulnerability

The October 8 episode of BD+C's "The Weekly" is available for viewing on demand.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021