flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ASHRAE Epidemic Task Force releases updated Building Readiness Guide

Codes and Standards

ASHRAE Epidemic Task Force releases updated Building Readiness Guide

Includes flush calculations to reduce time and energy to clear contaminants between occupancy periods.


By Peter Fabris, Contributing Editor | February 23, 2021

Courtesy Pixabay

The ASHRAE Epidemic Task Force has updated its reopening guidance for HVAC systems to help mitigate the transmission of the COVID-19 virus.

“The Building Readiness Guide includes additional information and clarifications to assist designers and commissioning providers in performing pre- or post-occupancy flush calculations to reduce the time and energy to clear spaces of contaminants between occupancy periods,” said Wade Conlan, ASHRAE Epidemic Task Force Building Readiness team lead, in a news release. “New information includes the theory behind the use of equivalent outdoor air supply, method for calculating the performance of filters and air cleaners in series, and filter droplet nuclei efficiency that help evaluate the systems’ ability to flush the building.”

There is now a link to a view-only Google Sheet that can be downloaded for use. This will help determine the available equivalent outdoor air changes and time to perform the flush. 

The guide now also includes data to consider for heating of outdoor air and the potential impact on pre-heat coils in systems.

Related Stories

| Mar 1, 2012

California bill aims to cut costs for commercial building energy retrofits

A bill in the California Assembly would allow the state to pool together property owners’ energy-retrofit loans.

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 23, 2012

Federal budget cuts put major building projects on hold

A plan to build the National Bio and Agro-Defense Facility in Kansas is among several major building projects in jeopardy after the Obama administration’s 2013 budget was unveiled. The budget would cut all construction spending for the facility.

| Feb 23, 2012

Federal agencies fixed on leasing LEED-certified space

The federal government is especially focused on renting LEED-certified spaces.

| Feb 23, 2012

Regulators investigating construction accident at World Trade Center

The New York Port Authority and the city’s fire and building departments are investigating an accident at the World Trade Center construction site in lower Manhattan after a crane dropped steel beams that fell about 40 stories onto the truck that delivered them.

| Feb 23, 2012

New Virginia statewide building code goes into effect March 1

After March 1, all building plans in Virginia must adhere to the 2009 code that was adopted a year ago.

| Feb 23, 2012

Privatizing flood insurance could lead to new code requirements

One thing that could pave the way toward private flood insurance would be NFIP reforms, like requiring new construction in flood-prone areas to be elevated.

| Feb 22, 2012

ACI BIM manual for cast-in-place concrete in development

The improved communication, coordination, and collaboration afforded by BIM implementation have already been shown to save time and money in projects.

boombox1
boombox2
native1

More In Category

Green

Tool helps construction and renovation projects with CalGreen compliance

One Click LCA recently launched a new software tool to help building teams comply with Part 11, Title 24, of the California Code of Regulations—CALGreen. The regulation is the nation’s first state-mandated green building code to include embodied carbon emission control as a mandatory component, effective from July 1, 2024.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021