flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Addition by subtraction: Art Share L.A. renovation strips away its acquired superfluity

Museums

Addition by subtraction: Art Share L.A. renovation strips away its acquired superfluity

The redesign of the 28,000-sf building is prioritizing flexibility, openness, and connectivity.


By David Malone, Associate Editor | July 5, 2017

Rendering courtesy of LOHA

Over the years, the 28,000-sf former textile-recycling factory that is home to Art Share L.A. has undergone numerous renovations, each one with its own specific purpose in mind. Now, a renovation of the entire building will create a cohesive layout to serve Art Share L.A.’s existing and envisioned programming and prioritize flexibility, openness, and connectivity.

Lorcan O’Herlihy Architects (LOHA) is in charge of the redesign that will clear away the fragmented build-up of previous renovations and try to capture the character of the original spaces while prepping them for new use.

 

Rendering courtesy of LOHA.

 

The new design strips away the redundant walls and circulation spaces to reveal the flexibility of the space and recapturing 30% of the building’s available square footage. The building’s manufacturing past will be visible in the brick walls, freight doors, concrete and wood posts, beam structure, and embedded train tracks.

The exhibition, performance, and administrative spaces will be reconfigured and expanded within the new space along a series of programmatic bands that are tied together through a cross-grain circulation pattern. The renovation will also consolidate the building’s multiple entrances into one main entry that can be open, safe, and accessible for extended periods of time.

 

Rendering courtesy of LOHA.

 

Social exchange is another key factor in the redesign as the interior spaces will extend outward and invite the surrounding Arts District to engage in the creative environment found within.

Related Stories

Museums | Jun 28, 2019

OMA unveils design for New Museum's second gallery building

The building is being designed by Office for Metropolitan Architecture/Shohei Shigematsu in collaboration with Cooper Robertson.

Museums | Jun 18, 2019

Frank Lloyd Wright Trust announces new Visitor and Education Center

Architect John Ronan will design the building.

Museums | May 15, 2019

The new Statue of Liberty Museum in New York seeks to educate and inspire

This LEED-Gold building features three exhibit spaces that give visitors more access to and engagement with the statue’s history.

Museums | Feb 27, 2019

Seoul’s Robot Science Museum will be built by robots

Robots will be in charge of jobs such as molding, welding, and polishing metal plates for the museum’s façade, and 3D printing concrete.

Museums | Feb 22, 2019

The National Museum of Qatar takes its design from the desert rose

Jean Nouvel designed the museum.

Museums | Jan 16, 2019

Disused British airfield to become an automotive museum

Foster + Partners is designing the facility.

Museums | Sep 10, 2018

Helsinki’s underground art museum opens to the public

JKMM designed the space.

Architects | Jun 14, 2018

Chicago Architecture Center sets Aug. 31 as opening date

The Center is located at 111 E. Wacker Drive.

boombox1 - default
boombox2 -
native1 -

More In Category


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021