The $92 million reconstruction of the St. Petersburg Municipal Pier has completed. Dubbed the Pier District, the 26-acre project includes a park, a 1,400-foot pier, a beach, restaurants, shops, artwork, interactive experiences, and entertainment and education areas.
Other project components include a custom-built, million-dollar playground; an interactive splash pad; a tilted lawn; the Spa Beach Pavilion; the Marketplace with its Solar Shade Structures and Market Stalls; the 35,000-sf pier plaza; the five-story Pierhead building; and the Tampa Bay Watch Discovery Center.
Five of the pier’s previous caissons were preserved and are now being used to support the fishing deck of the new pier. New 24”x24” precast concrete pile foundations were driven an average depth of 75 feet below the mudline and are made of FDOT class five concrete, including admixtures for extreme marine environments and weather conditions, and have a lifetime of at least 75 years. The new pier has also been elevated to consider projected sea level rise through the year 2100.
Admission is free to the public and visitors can arrive via boat and dock at one of the courtesy boat slips or drive and park in a lot fit-out with solar photovoltaic canopies. Eco-friendly trams continuously run and connect the entire property.
See Also: Two eight-story residential towers and a dining commons complete on Cal Poly Pomona’s campus
Skanska provided reconstruction and construction management services for the project.
Related Stories
| Apr 6, 2012
Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning
The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.
| Apr 4, 2012
JCJ Architecture designs New York City's first casino
Aqueduct Racetrack complex transformed into modern entertainment destination.
| Apr 3, 2012
Luxury hotel 'groundscraper' planned in abandoned quarry
Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.
| Jan 15, 2012
Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.
The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.
| Dec 27, 2011
Ground broken for adaptive reuse project
Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.
| Dec 19, 2011
Chicago’s Aqua Tower wins international design award
Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.
| Dec 12, 2011
Mojo Stumer takes top honors at AIA Long Island Design Awards
Firm's TriBeCa Loft wins "Archi" for interior design.
| Dec 5, 2011
Summit Design+Build begins renovation of Chicago’s Esquire Theatre
The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.
| Nov 28, 2011
Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.
Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.