flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

7 must reads for the AEC industry today: April 7, 2020

Market Data

7 must reads for the AEC industry today: April 7, 2020

Leo A Daly's Hotel2Hospital prototype takes shape, while the number of delayed projects reaches 2,550 in the U.S. amid coronavirus pandemic.


By BD+C Editors | April 7, 2020
7 must reads for the AEC industry today: April 7, 2020
7 must reads for the AEC industry today: April 7, 2020

 

1. As cities scramble for hospital beds to treat COVID-19 patients, Leo A Daly offers a hotel-to-hospital solution (BD+C)
Leo A Daly is currently negotiating with several hoteliers about converting large portfolios of hotels into healthcare facilities that follow the firm’s Hotel2Hospital prototype, which would conform with design guidelines released last week to state governments by the U.S. Army Corps of Engineers, which relax some of the hospital safety standards.

2. New South Korean retail building looks like a molting insect (BD+C)
The building, Galleria’s sixth branch, has a very unique design to say the least. The facade combines multifaceted glass that appears to be breaking out from within opaque stone, as if the building was shedding its old skin and revealing the new.

3. How to convert college dorms to support the coronavirus crisis (NBBJ)
With the number of global coronavirus cases increasing each day, health centers are more burdened than ever before, witnessing severe bed shortages for critically-ill patients. At the same time, housing at many higher education institutions now stands mostly vacant — with hundreds of thousands of students home for social distancing and instruction now delivered online.

4. COVID-19's impact on the multifamily sector (BD+C)
COVID-19 is taking its toll on the U.S. vertical construction market. In a March 23-26 survey by the Associated General Contractors of America, 20% of the 659 respondents from "buildings contractors" reported projects being shut down or delayed by government officials, while 45% of those surveyed said an owner had instructed them to halt or cancel construction on a current or planned project.

5. Number of confirmed delayed projects reaches 2,550 in the U.S., 1,350 in Canada (ConstructConnect)
ConstructConnect's Delayed Project Tracker is updated daily. 

6. Climate-informed HVAC increases in relative humidity may fight pandemic viruses (SmithGroup)
Indoor relative humidity is a function of seasonal climate and building HVAC. The range of 40% to 60% RH may reduce contagion and help those who are infected.

7. Construction completed on first phase of Chicago's McCormick Place into Alternate Care Facility (Walsh Construction)
"Walsh Construction is leading the temporary conversion of a portion of the McCormick Place Convention Center into an Alternate Care Facility for novel coronavirus patients."


For more top stories from BD+C,  
sign up for the BD+C Daily 5 newsletter


 

Related Stories

High-rise Construction | Jan 23, 2017

Growth spurt: A record-breaking 128 buildings of 200 meters or taller were completed in 2016

This marks the third consecutive record-breaking year for building completions over 200 meters.

Market Data | Jan 18, 2017

Fraud and risk incidents on the rise for construction, engineering, and infrastructure businesses

Seven of the 10 executives in the sector surveyed in the report said their company fell victim to fraud in the past year.

Market Data | Jan 18, 2017

Architecture Billings Index ends year on positive note

Architecture firms close 2016 with the strongest performance of the year.

Market Data | Jan 12, 2017

73% of construction firms plan to expand their payrolls in 2017

However, many firms remain worried about the availability of qualified workers.

Market Data | Jan 9, 2017

Trump market impact prompts surge in optimism for U.S. engineering firm leaders

The boost in firm leader optimism extends across almost the entire engineering marketplace.

Market Data | Jan 5, 2017

Nonresidential spending thrives in strong November spending report

Many construction firms have reported that they remain busy but have become concerned that work could dry up in certain markets in 2017 or 2018, says Anirban Basu, ABC Chief Economist.

Market Data | Dec 21, 2016

Architecture Billings Index up slightly in November

New design contracts also return to positive levels, signifying future growth in construction activity. 

Market Data | Dec 21, 2016

Will housing adjust to an aging population?

New Joint Center report projects 66% increase in senior heads of households by 2035.

Market Data | Dec 13, 2016

ABC predicts modest growth for 2017 nonresidential construction sector; warns of vulnerability for contractor

“The U.S. economy continues to expand amid a weak global economy and, despite risks to the construction industry, nonresidential spending should expand 3.5 percent in 2017,” says ABC Chief Economist Anirban Basu.

Market Data | Dec 2, 2016

Nonresidential construction spending gains momentum

Nonresidential spending is now 2.6 percent higher than at the same time one year ago.

boombox1 - default
boombox2 -
native1 -

More In Category

Construction Costs

New download: BD+C's May 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021