flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

5 must reads for the AEC industry today: April 17, 2020

Market Data

5 must reads for the AEC industry today: April 17, 2020

Meet the 'AEC outsiders' pushing the industry forward and the world's largest Living Building.


By BD+C Editors | April 17, 2020


1. Meet the ‘AEC outsiders’ who are helping to push the industry into the new decade (BD+C)
"As part of BD+C’s 2019 Giants 300 Technology and Innovation Study, 130 of the nation’s largest AEC firms were polled on a variety of topics, including whether or not the firm had a non-AEC hire in the past 24 months. Nearly two-thirds (63.8%) reported that they had hired an “AEC outsider” in this time period."

2. This will be the largest Living Building in the world
"Designed to last 500 years, the building has a projected Energy Use Index (EUI) of 18.6 kBtu/SF/YR; a typical Portland office building built to code has a EUI of 40.8 kBtu/SF/YR. A 133 kW PV solar array will occupy 8,300 sf on the building's roof and another 195.4 kW PV array will occupy 10,300 sf on the roof of a partner organization."

3. Boston mayor considers 'slow ramp-up' for construction (Boston Business Journal) 
"Boston Mayor Martin J. Walsh intends to speak with construction leaders in the next few days to discuss potentially restarting construction within the city, which Walsh halted in March in response to the coronavirus pandemic."

4. Building officials turn to video inspections to mitigate COVID-19 risk (Construction Dive)
"Building inspectors from Ohio, Nevada and Florida found common benefits to performing inspections using inexpensive tools like Facetime, Skype, Google Duo and Microsoft Teams. These include being able to perform inspections earlier in the day since they don't have to physically start their day in the office and then spend time driving to the project. The consensus was that as long as the inspection would be visually-based under normal circumstances, an inspection via video is acceptable."

5. Construction project on hold? Don't forget to maintain stored equipment (Karpinski Engineering) 
"One of the downstream effects of the COVID-19 pandemic is that many owners are placing their construction projects on hold. As they do so, they need to make sure that they are properly storing any equipment that has been delivered — or even installed — that will not be operational while the project is on hold," writes Karpinski Engineering's Lee Hodkey.

 

For more top stories from BD+C,  
sign up for the BD+C Daily 5 newsletter

Related Stories

Senior Living Design | May 9, 2017

Designing for a future of limited mobility

There is an accessibility challenge facing the U.S. An estimated 1 in 5 people will be aged 65 or older by 2040.

Industry Research | May 4, 2017

How your AEC firm can go from the shortlist to winning new business

Here are four key lessons to help you close more business.

Engineers | May 3, 2017

At first buoyed by Trump election, U.S. engineers now less optimistic about markets, new survey shows

The first quarter 2017 (Q1/17) of ACEC’s Engineering Business Index (EBI) dipped slightly (0.5 points) to 66.0.

Market Data | May 2, 2017

Nonresidential Spending loses steam after strong start to year

Spending in the segment totaled $708.6 billion on a seasonally adjusted, annualized basis.

Market Data | May 1, 2017

Nonresidential Fixed Investment surges despite sluggish economic in first quarter

Real gross domestic product (GDP) expanded 0.7 percent on a seasonally adjusted annualized rate during the first three months of the year.

Industry Research | Apr 28, 2017

A/E Industry lacks planning, but still spending large on hiring

The average 200-person A/E Firm is spending $200,000 on hiring, and not budgeting at all.

Market Data | Apr 19, 2017

Architecture Billings Index continues to strengthen

Balanced growth results in billings gains in all regions.

Market Data | Apr 13, 2017

2016’s top 10 states for commercial development

Three new states creep into the top 10 while first and second place remain unchanged.

Market Data | Apr 6, 2017

Architecture marketing: 5 tools to measure success

We’ve identified five architecture marketing tools that will help your firm evaluate if it’s on the track to more leads, higher growth, and broader brand visibility.

Market Data | Apr 3, 2017

Public nonresidential construction spending rebounds; overall spending unchanged in February

The segment totaled $701.9 billion on a seasonally adjusted annualized rate for the month, marking the seventh consecutive month in which nonresidential spending sat above the $700 billion threshold.

boombox1 - default
boombox2 -
native1 -

More In Category

Construction Costs

New download: BD+C's May 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021