flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

105,000-sf vertical mass timber expansion will cap D.C.’s 80 M Street

Wood

105,000-sf vertical mass timber expansion will cap D.C.’s 80 M Street

Hickok Cole is designing the project.


By David Malone, Associate Editor | January 24, 2020
80 M expansion

All renderings courtesy Hickok Cole

80 M Street, a 286,000-sf office building in Washington, D.C.’s Capitol Riverfront district, is set to receive a 105,000-sf mass timber vertical expansion.

The project will become the first commercial office building in D.C. to feature mass timber new construction. The building will use a composite wood product engineered from hardwood grown in the Pacific Northwest. The new floors will feature 16-foot ceilings and 12-foot-high windows, a combination that will allow for double the amount of natural light penetration compared to a standard office.

 

80 M expansion from across the street

 

The expansion will also feature exposed ceilings, polished concrete floors, and myriad connected outdoor spaces that will add nearly 4,000 sf of outdoor amenity space atop the building.

 

See Also: Unicorn Island’s first building nears completion

 

Columbia Property Trust is developing the project. The mass timber expansion is anticipated to be ready for tenant build out in 2021.

 

80 M interior space

 

80 M 12-foot windows

 

80 M expansion terrace

 

Related Stories

Wood | Feb 15, 2018

Japanese company announces plans for the world’s tallest wooden skyscraper

The planned tower would rise 350 meters (1148 feet).

Wood | Feb 5, 2018

The largest timber office building in the U.S. will anchor Newark, N.J. mixed-use development

Michael Green Architecture is designing the building.

Multifamily Housing | Jan 4, 2018

Shigeru Ban’s mass timber tower in Vancouver gets city approval

The 232-foot-tall Terrace House luxury condo development will be the tallest hybrid wood structure in North America.

Sports and Recreational Facilities | Dec 18, 2017

Canada’s newest funicular makes Edmonton’s largest green space more accessible

The incline elevator is located in downtown Edmonton and was publicly funded.

Wood | Nov 30, 2017

The first large-scale mass timber residence hall in the U.S. is under construction at the University of Arkansas

Leers Weinzapfel Associates, Modus Studio, Mackey Mitchell Architects, and OLIN collaborated on the design.

Codes and Standards | Nov 15, 2017

U.S. finalizes tariffs on Canadian softwood lumber

The duties would add 20% or more to cost if trade negotiators can’t find common ground.

Sponsored | Wood | Oct 24, 2017

Multifamily framers recommend AdvanTech® products for flat, even flooring base

With lengthy exposure time, reliably stiff, moisture-resistant subflooring is key in reducing risk of delays.

Green | Aug 11, 2017

A school’s sports hall is created entirely from bamboo

The building boasts a zero-carbon footprint and is naturally ventilated.

Codes and Standards | Jul 27, 2017

Five fire scenarios tested on full-scale mass timber building

Results will help inform code changes.

Industrial Facilities | Jul 26, 2017

EGGER will invest $700 million to build its first U.S. manufacturing facility

The company says the new facility will create 770 jobs over the next 15 years.

boombox1 - default
boombox2 -
native1 -

More In Category

Mass Timber

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021