Merriweather Park at Symphony Woods in Columbia, Md., has recently received an outdoor performance venue that may be the most eye-catching aspect of the entire park. The “Chrysalis” is a bright green 5,000-sf performance space that includes a stage under a steel and aluminum-shingled shell.
Designed by MARC FORNES/THEVERYMANY with Living Design Lab as the architect of record, the Chrysalis makes use of a series of complex curves and arched openings to provide sightlines to the forest beyond. Arup, which provided theatrical and lighting design, and structural, mechanical, electrical, and plumbing engineering services, used 3D modeling to address some of the challenges the project presented.
Arup evaluated the siting of the pavilion to optimize sightlines for the audience. Wind tunnel tests helped to determine the design of the structure’s galvanized steel beyond the building and tunable LED lighting was designed to help animate the structure and emphasize its form. Acoustic studies helped to achieve optimal sound performance inside and outside of the structure.
The Build Team also consisted of specialty design-builder A. Zahner Company; steel fabricator and installer Walters Group; and general contractor Whiting-Turner Construction Company.
The Chrysalis officially opened on April 22.
Related Stories
| May 20, 2014
Kinetic Architecture: New book explores innovations in active façades
The book, co-authored by Arup's Russell Fortmeyer, illustrates the various ways architects, consultants, and engineers approach energy and comfort by manipulating air, water, and light through the layers of passive and active building envelope systems.
| May 19, 2014
What can architects learn from nature’s 3.8 billion years of experience?
In a new report, HOK and Biomimicry 3.8 partnered to study how lessons from the temperate broadleaf forest biome, which houses many of the world’s largest population centers, can inform the design of the built environment.
| May 13, 2014
19 industry groups team to promote resilient planning and building materials
The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.
| May 11, 2014
Final call for entries: 2014 Giants 300 survey
BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.
| May 2, 2014
World's largest outdoor chandelier tops reworked streetscape for Cleveland's PlayhouseSquare
Streetscape project includes monumental gateway portals, LED signage, and a new plaza, fire pit, sidewalk café, and alfresco dining area.
| Apr 29, 2014
USGBC launches real-time green building data dashboard
The online data visualization resource highlights green building data for each state and Washington, D.C.
| Apr 16, 2014
Upgrading windows: repair, refurbish, or retrofit [AIA course]
Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.
| Apr 11, 2014
First look: KPF's designs for DreamWorks in the massive Shanghai DreamCenter
Two blocks of offices will be centerpiece of new cultural and lifestyle district in the West Bund Media Port.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.