flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

A European manufacturer says its engineered wood products can store carbon for decades

Wood

A European manufacturer says its engineered wood products can store carbon for decades

Metsä Wood’s laminated veneer lumber was used to create the exterior wall panels of a 17,000-square-meter concrete plant in Germany.


By Novid Parsi, Contributing Editor | November 1, 2022
Metsa Wood Group ext
Courtesy Metsa Wood.

Metsä Wood, a Finland-based manufacturer of engineered wood products, says its sustainable, material-efficient products can store carbon for decades, helping to combat climate change. 

To build its new concrete plant of 17,000 square meters, German construction specialist Brüninghoff, which makes prefabricated wooden materials, such as laminated veneer lumber, wanted to use materials that fit its sustainability strategy. So the company chose Kerto LVL—prefabricated panels and studs made by Metsä Wood—for the plant’s exterior non-load-bearing walls. The panels were attached to load-bearing concrete frames. 

Metsä Wood’s Kerto LVL, a structural laminated veneer lumber, takes up less volume than other wood materials and also has an excellent strength-to-weight ratio. In addition to supporting the sustainability strategy, Kerto LVL led to optimized assembly times.

The Brüninghoff plant has a total of 239 wall elements with an area of around 5,000 square meters. It used a total of 242 cubic meters of Kerto LVL. The team used a carbon storage calculator to determine that the Kerto LVL stores 165.8 metric tons of carbon dioxide equivalent (a unit based on global warming potential)—meaning that, compared to other construction materials, the wood in Metsä Wood’s product is “highly sustainable,” the company says.

“Through this construction, we are forcing structural change towards construction that supports circular economy. Change is needed as the construction sector is responsible for consuming huge quantities of resources. It is a question of optimizing construction methods, developing low-emission concepts, and increasingly backing recycling solutions,” Frank Steffens, managing director, Brüninghoff, said in a statement.

The building has already received pre-certification per the ecological, economic, and social criteria of the German Society for Sustainable Construction (DGNB).

Metsa Wood Group ext 2
Courtesy Metsa Wood.
Metsa Wood Group int
Courtesy Metsa Wood.
Metsa Wood Group int 2
Courtesy Metsa Wood.
Metsa Wood Group int 3
Courtesy Metsa Wood.

 

Related Stories

Wood | May 14, 2021

What's next for mass timber design?

An architect who has worked on some of the nation's largest and most significant mass timber construction projects shares his thoughts on the latest design trends and innovations in mass timber.

Sponsored | Wood | Nov 12, 2020

Engineered Wood Gets an Easy A

A Washington school district creatively leveraged the aesthetic and acoustic benefits of engineered wood products in their newly constructed school.

Wood | Oct 19, 2020

Valle Wood is Norway’s largest commercial building made of solid timber

Lund+Slaatto designed the building.

Office Buildings | Jul 9, 2020

Sydney will be home to the world’s tallest hybrid timber tower

SHoP Architects, in collaboration with BVN, is designing the project.

Building Materials | Jul 5, 2020

A new report predicts significant demand growth for mass timber components

There should be plenty of wood, but production capacity needs to catch up.

Wood | Apr 1, 2020

HDR will design a mass timber Ramada Hotel

The hotel will be located in Kelowna, British Columbia.  

Wood | Feb 3, 2020

Mass timber construction grows up

Mass timber is finally making a dent in commercial construction. But can it keep up with demand?

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021