Top 100 institutional design firms

Top 100 institutional design firms
(2007 billings in $ millions)
  Company
Billings
1. AECOM Technology Corp. 761,670,000
2. Jacobs Engineering Group 550,880,120
3. CH2M HILL 409,684,080
4. Arup 396,000,000
5. URS Corp. 352,000,000
6. HOK 263,188,266
7. Perkins+Will 210,800,000
8. HDR Architecture 180,200,000
9. Skidmore, Owings & Merrill 122,880,000
10. Heery International 122,667,200
11. Stantec 112,088,969
12. Parsons Brinckerhoff 109,600,000
13. STV Group 106,200,000
14. Cannon Design 99,120,000
15. HNTB Architecture 96,738,321
16. Fluor 91,406,400
17. HKS 90,336,120
18. RTKL Associates 84,694,000
19. RS&H 80,850,000
20. SmithGroup 80,124,000
21. NBBJ 75,981,860
22. Burt Hill 74,634,010
23. Rosser International 74,250,000
24. Gensler 73,500,000
25. DLR Group 70,824,000
26. Perkins Eastman 66,300,000
27. PageSoutherlandPage 63,669,600
28. Leo A Daly 60,960,000
29. NTD Architecture 55,856,000
30. RMJM 53,460,000
31. Gresham, Smith and Partners 52,834,400
32. Smith Seckman Reid 52,575,000
33. HMC Architects 52,420,486
34. BSA LifeStructures 50,892,070
35. Hammel, Green and Abrahamson 49,595,000
36. Einhorn Yaffee Prescott 48,312,000
37. Anshen+Allen 46,554,094
38. Burns & McDonnell 45,360,000
39. Ellerbe Becket 45,165,600
40. PBK 44,795,000
41. Paulus, Sokolowski and Sartor 42,166,000
42. Thornton Tomasetti 40,170,000
43. Dewberry 39,200,000
44. TMAD Taylor & Gaines 38,561,806
45. Zimmer Gunsul Frasca Architects 38,354,273
46. Moseley Architects 38,200,000
47. Harley Ellis Devereaux 37,185,000
48. Shepley Bulfinch Richardson and Abbott 36,623,871
49. Fanning/Howey Associates 36,532,322
50. X-nth 35,218,871
51. WHR Architects 34,790,009
52. OWP/P 34,320,000
53. Vanderweil Engineers 33,119,407
54. Affiliated Engineers 32,472,500
55. KlingStubbins 30,600,000
56. TRO Jung|Brannen 30,566,250
57. TLC Engineering for Architecture 29,970,000
58. EwingCole 28,890,000
59. Sasaki Associates 28,050,000
60. FKP Architects 27,434,880
61. SSOE 27,000,000
62. S/L/A/M Collaborative, The 26,164,600
63. Clark Nexsen 26,060,345
64. LPA 25,556,944
65. Harvard Jolly 24,257,881
66. Thomas Group, The 24,255,000
67. FreemanWhite 24,251,364
68. M+W Zander 22,750,000
69. CUH2A 22,405,600
70. Arquitectonica 21,834,000
71. PBS&J 21,593,885
72. Simpson Gumpertz & Heger 20,795,250
73. Baker and Associates 20,640,000
74. Karlsberger 20,500,000
75. CTA Architects Engineers 20,384,000
76. Durrant Group, The 19,800,000
77. Flack + Kurtz 19,610,000
78. H+L Architecture 19,215,126
79. Syska Hennessy Group 19,214,812
80. RBB Architects 18,700,000
81. Flad Architects 18,450,000
82. Sparling 18,177,000
83. Odell Associates 18,105,000
84. Weidlinger Associates 18,000,000
85. WWCOT 17,955,000
86. L. Robert Kimball & Associates 17,340,260
87. Ingenium Group 17,262,000
88. Albert Kahn Associates 17,157,000
89. Degenkolb Engineers 17,010,080
90. Magnusson Klemencic Associates 16,984,191
91. Fentress Architects 16,902,540
92. Kaplan McLaughlin Diaz 16,900,000
93. Benham Cos., The 16,770,115
94. KPFF Consulting Engineers 16,050,000
95. KJWW Engineering Consultants 15,684,812
96. RNL Design 15,485,440
97. Henneman Engineering 14,910,000
98. Mazzetti & Associates 14,620,000
99. Astorino 14,409,912
100. Ross & Baruzzini 14,400,000
         

Comments on: "Top 100 institutional design firms "

Building owners must plan ahead for roof replacement to avoid emergency leak rem
Building owners must plan ahead for roof replacement to avoid emergency leak rem
No building owner wants to be caught unprepared by catastrophic roof failure. Emergency roof replacements tend to be more expensive than planned ones, and damage to interiors may mean unrecovered costs and detrimental...
AIA: New Developments in Concrete Construction
AIA: New Developments in Concrete Construction
Concrete has long been a reliable building material for commercial and institutional projects. Yet recent trends, including the growth in hospitality and urban rental project starts, as well as mixed-use towers and transit-...
AIA Rainscreens BD+C DEcember 2011
AIA Rainscreens BD+C DEcember 2011
Until recently, it has been lighting, mechanical, and control system upgrades which have received the most attention in the green building movement. At long last, the industry is now recognizing building enclosures as a long...
Brick and stone masonry have served as reliable and valuable elements of commercial building projects for centuries, gracing urban and rural landscapes since time immemorial. Building Teams have trusted clay brick to bring...
Buildings Teams have long sought to keep water out of buildings, to prevent corrosion, rot, and other damage and to keep building occupants comfortable and dry. Yet only recently has air infiltration also been seen as a...
Learning Objectives After completing this course, you will be able to:
Ambient noise levels in some facility types are trending up and becoming a barrier to clear communication between building occupants. A 2005 study conducted by Ilene Busch-Vishniac, PhD, a dean and professor of mechanical...
Download Complete White Paper Download Introduction Download Chapters 1-4Defining Net-Zero Energy Buildings
Our seventh White Paper on Green Buildings focuses on the role of water in sustainable design and construction. The editors conclude with a set of 21 detailed recommendations for the consideration of the Building Teams, home...
Click here to read BD+C's 2008 White Paper: Green Buildings + Climate Change
Click here to read BD+C's 2007 Green Buildings Research White Paper: Where Building Owners, End Users and AEC Professionals Stand on Sustainability and Green Building
Click here to read BD+C White Paper 2006: Green Buildings and the Bottom Line The ‘New Reality’ of Green Building From Environmental Cause to Financial Opportunity
Click here to read BD+C's Life Cycle Assessment and Sustainability White Paper 2005
It’s time to raise the performance of our existing commercial buildings. To reduce energy consumption. To increase durability. To lessen environmental impact and lifecycle cost. The 4.8 million existing commercial buildings...
Wired glass was the only fire rated glass (FRG) product available for over 100 years. In traditional wired glass, the embedded wires hold annealed glass in place during the fire test to achieve a fire rating. While the wires...
Building project teams involved in design- build and other forms of integrated project delivery (IPD) face new and fast-moving chal- lenges in project team organization, software and hardware, networking, file sharing and...
To benefit from new building design and construction technologies as well as novel project management approaches, leading AEC organizations of all sizes and scales are deploying building information modeling (BIM). While the...

Top Rated Articles

AWARDS

Award Winners
View BD+C’s award-winning projects and people, including our ‘40 Under 40’ superstars, top projects from our Building Team Awards and Reconstruction Awards programs, and the Best AEC Firms to Work For.