Plumbing

Cool coolers

SwirlFlo barrier-free coolers have a tubular arm that supports the basin, while a pushbutton disc has replaced the pushbar. A splash-minimizing contoured basin also has been added. Available in single-, two-level, refrigerated, and nonrefrigerated models.

Elkay Manufacturing Co.

Reader Service No. 234

The wave

Lavatory system uses a wave look to combine a lower, ADA-compliant sink with a higher sink, making it suitable for upscale retail centers, restaurants, offices, hotels, and fitness centers. The Frequency Lavatory System is available in six models, with one-, two-, and three-station options. An infrared-controlled faucet and a line of coordinating accessories, including soap dispensers, mirrors, shelves, and towel dispensers, all come in the same look.

Bradley.

Reader Service No. 230

Get the lead out

The Puritan line of water-filtered coolers come equipped with a lead-reduction system that removes lead particles, cysts, and chlorine. Available in single- and bi-level barrier-free wallmount models that meet ADA regulations. All models feature a standard platinum vinyl finish.

Halsey Taylor.

Reader Service No. 237

Seamless transition

The Ford Motor Co.'s Wixom, Mich., plant needed to switch its water supply from well water to city water. To do this, a water-booster system, completely enclosed in a fiberglass modular structure, was created to house the needed pumps and controls together and installed outside the production area of the plant. The system was shipped to the site completely assembled and ready to install so that the plant could continue running while making the switch from well water to city water. The system can deliver from zero to 2,000 GPM at a constant discharge pressure of 84 PSIG when the minimum suction pressure is 30 PSIG. The system is capable of meeting all conditions from zero to maximum flow without exceeding the temperature design of the motor windings. Other features include a low-temperature alarm with contacts for remote monitoring. Pumps and monitors are removable without having to disassemble other components because of the building design. Double-door access to any part of the system makes it serviceable inside the heated area.

Metropolitan Industries Inc.

Reader Service No. 231

         
 

Comments on: "Plumbing "

The colorful ribboned flooring at Toronto’s Corus Quay mimics the iconic corkscr
The colorful ribboned flooring at Toronto’s Corus Quay mimics the iconic corkscr
Discussions of commercial flooring tend to focus on the floor covering or finish material. This is hardly surprising, since the covering is the part of the floor that stakeholders see, interact with, and care about most. The...
The use of light load-bearing glass to create transparent stairs, floors, and ot
The use of light load-bearing glass to create transparent stairs, floors, and ot
Glass has taken on new life in recent building years. Long valued for its transparency and lightness, glass is now also being considered for its structural and protective capabilities. Beyond the technique known as...
Building owners must plan ahead for roof replacement to avoid emergency leak rem
Building owners must plan ahead for roof replacement to avoid emergency leak rem
No building owner wants to be caught unprepared by catastrophic roof failure. Emergency roof replacements tend to be more expensive than planned ones, and damage to interiors may mean unrecovered costs and detrimental...
AIA: New Developments in Concrete Construction
AIA: New Developments in Concrete Construction
Concrete has long been a reliable building material for commercial and institutional projects. Yet recent trends, including the growth in hospitality and urban rental project starts, as well as mixed-use towers and transit-...
AIA Rainscreens BD+C DEcember 2011
AIA Rainscreens BD+C DEcember 2011
Until recently, it has been lighting, mechanical, and control system upgrades which have received the most attention in the green building movement. At long last, the industry is now recognizing building enclosures as a long...
Brick and stone masonry have served as reliable and valuable elements of commercial building projects for centuries, gracing urban and rural landscapes since time immemorial. Building Teams have trusted clay brick to bring...
Making the Most of the Reconstruction Boom Reconstruction in its many forms—tenant improvements, retail fitouts, adaptive reuse, historic preservation, gut rehab, and so on—is keeping many design and construction firms...
The topic of water shortages is nothing new, as cities around the globe struggle with drought, water quality, supply constraints, and failing infrastructures. However, the idea of new plumbing codes and design standards...
Guard booths, stations and shelters are defense strategy linchpins, becoming increasingly integral to perimeter defense planning. Before evaluating the efficacy of different guard booth configurations, and before selecting a...
From the company that brought you Construction Computing Magazine’s 2011 BIM Product of the Year ArchiCAD 15, the “Get There Faster with ArchiCAD” whitepaper examines five critical areas to explore before making your final...
Download Complete White Paper Download Introduction Download Chapters 1-4Defining Net-Zero Energy Buildings
Our seventh White Paper on Green Buildings focuses on the role of water in sustainable design and construction. The editors conclude with a set of 21 detailed recommendations for the consideration of the Building Teams, home...