flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Principal Riverwalk Pavilion, Des Moines, Iowa

Principal Riverwalk Pavilion, Des Moines, Iowa


By American Institute of Steel Construction | May 5, 2016

Photo: Paul Crosby

Owner: City of Des Moines, Des Moines, Iowa

*Architect: Substance, Des Moines, Iowa

Structural Engineer: Charles Saul Engineering, Des Moines, Iowa

General Contractor: Covenant Construction Services, Waukee, Iowa

*Firm that entered the project in the IDEAS2 contest

This 2,200-sq.-ft pavilion occupies a prominent site along the Des Moines River in downtown Des Moines, Iowa. The building is a key part of the new Principal Riverwalk, a $50 million public/private partnership which will revitalize the riverfront and draw Des Moines’ residents back to the river. The $1.2 million building sits adjacent to a new recreational trail, street-level promenade and riverfront promenade anchoring the west end of the historic Court Avenue Bridge.

The triangular building was conceived as a crystalline space resting at the prow of a gently sloping, boat-shaped plaza formed by the adjacent trails, streets and promenades. This crystal is, in turn, shrouded by a folded black zinc skin. This skin is selectively unfolded to provide panoramic views out of the upper level café. The resulting roof overhangs provide solar protection to the buildings east and south façades. The west façade is louvered to allow for views upriver to the north while blocking the harsh western sun. To accomplish this visual effect, an exposed steel frame was utilized to support zinc skin. In addition, steel tube sections are concealed within the zinc skin itself. This structure discretely accommodates the multiple cantilevers and reduces the apparent thickness of this folded plane.

The interior of the café is a single, glass dining space with a solid concrete “chimney” to the south and a wood and steel “kitchen” block to the west. The placement of these two elements allows the east riverfront façade to be completely unobstructed while framing views to the southern plaza. This crystalline café appears to hover above a set of service spaces excavated out of the plaza. These lower level spaces include public restrooms and a central hand-wash fountain, as well as electrical and mechanical spaces. The building employs a number of sustainable and energy conservation strategies including geothermal heating and cooling, daylight harvesting, and LED lighting, to significantly reduce both operating and life-cycle costs.

The project involved a complex owner group that included representatives from the city of Des Moines, the Polk County Board of Supervisors, the U.S. Army Corps of Engineers, myriad city boards and commissions, and the Principal Financial Group. This team cooperated over a period of eight years to guide the design team, secure public and private funding, and implement this small, but ambitious work. The result is a building that activates the public plaza and creates an understandable “place.” The architect worked with the Greater Des Moines Public Art Foundation and internationally recognized artist, Jun Kaneko, to locate site specific artwork to further energize this space. This series of large-scale ceramic works, called Dangos, have become iconic. The Principal Riverwalk Pavilion is a destination that successfully draws the citizens of Des Moines back to the river.

boombox1 - default
boombox2 -
native1 -
halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â