flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

2019 Timber-Strong Design Build Competition

Sponsored Content

2019 Timber-Strong Design Build Competition


Teams assemble their structures at the Disneyland® Hotel in Anaheim, California
Teams assemble their structures at the Disneyland® Hotel in Anaheim, California

APA – The Engineered Wood Association, the American Wood Council (AWC) and Simpson Strong-Tie partnered with the National Council of Structural Engineers Associations (NCSEA) to sponsor the Timber-Strong Design Build (TSDB) Competition at the 2019 NCSEA Summit. Competing teams built a two-story wood structure and were required to submit a report consisting of a preliminary structural engineering design, material cost estimate, structural calculations and estimated carbon footprint in addition to a presentation. The TSDB competition gives students an opportunity to experience the full spectrum of designing and building a real-world project in a team environment. Additionally, the students were encouraged to prefabricate the walls, floors and roofs into building components to save time during the competition and mimic the technique of off-site panelization happening in the wood industry.

 

Let the Building Begin

 

The on-site building portion of the competition took place Nov. 12 at the Disneyland® Hotel in Anaheim, California. Six teams built two-story wood structures within a 90-minute time period. The addition of a second story to the competition created an added challenge for students to build, requiring understanding of a continuous load path.

Participant teams came from California State University, Sacramento; University of California, Los Angeles; California Polytechnic State University, San Luis Obispo; University of Kentucky; University of Minnesota, Twin Cities and University of South Florida.

Structural engineer judges observed and scored aspects of the build while volunteers monitored student safety as well as the use of tools and equipment. Judging was based on the creativity and efficiency of the design, speed and accuracy of construction, as well as a complete load path. A load test of the structure’s cantilever beam was performed to compare the measured deflection to the student team’s predicted design deflection. Lastly, the ability to communicate their project to the judges was scored, as each team gave a live presentation of their completed designs.

 

Teams were encouraged to use prefabricated walls, floors and roofs to mimic current panelization practices in the construction industry.

 

We Have a Winner

 

A couple of teams had little experience building with wood prior to the competition. The University of South Florida team actually set out on its own to learn about wood design. The University of Kentucky team, which earned third place, had a structural engineer on-site that spoke highly of the team’s learning leading up to the event and remained on-site with the academic adviser to support the students during the competition. And Cal Poly, San Luis Obispo’s ARCE team, disappointed with its performance at the 2019 Pacific Southwest Conference’s competition, took it to heart to dominate this event; these efforts were rewarded with the first-place prize.

After the competition, teams were invited to donate their structures to the Childhood Cancer Foundation of Southern California (CCFSC). Three teams donated, and as a special highlight of the day, a young CCFSC patient chose which playhouse would be reassembled in her backyard, courtesy of Simpson Strong-Tie employees.

The Spring 2020 Timber-Strong Design Build Competition, scheduled for April 4 at California State University, Fullerton as part of the American Society of Civil Engineers (ASCE) Pacific Southwest Conference, did not occur as planned due to COVID-19. While the in-person builds and presentations were canceled, 14 of the 18 registered teams still submitted their project reports for evaluation. When judging of the reports was complete, the top three teams were California State University, Fullerton, with first place; University of California, Los Angeles, at second place; and California Polytechnic State University, San Luis Obispo, with third place.

Read the full feature at www.apawood.org/summer-2020-designers-circle.
 

More from Author

APA – The Engineered Wood Association | Nov 12, 2020

Engineered Wood Gets an Easy A

A Washington school district creatively leveraged the aesthetic and acoustic benefits of engineered wood products in their newly constructed school.

APA – The Engineered Wood Association | Oct 1, 2020

Exposing the beauty of engineered wood

A glimpse into the creative application of engineered wood products on one of the largest mass timber projects in the Pacific Northwest.

APA – The Engineered Wood Association | Aug 20, 2020

Back to basics: Framing big buildings right

 A look into the most common wood construction framing errors, and how to avoid them, in today’s nonresidential construction industry.

APA – The Engineered Wood Association | Jul 14, 2020

Measuring the environmental performance of engineered wood products

“Green” is just a buzzword unless environmental impacts can be demonstrated scientifically.

APA – The Engineered Wood Association | Jun 12, 2020

Fire Phraseology FAQs: FRT versus Fire Rating

Fire resistant, fire retardant, fire rating: what’s the difference?

APA – The Engineered Wood Association | May 11, 2020

The basics of wood frame connection design

Good connection design makes use of wood’s natural characteristics and harnesses its strengths.

APA – The Engineered Wood Association | Apr 15, 2020

Engineered wood in retrofits and remodels

A cost-effective replacement for hard-to-source timbers in historical projects.

APA – The Engineered Wood Association | Mar 3, 2020

Mass timber has banks seeing green

First United Bank Invests in First Mass Timber Buildings in Texas, Oklahoma

APA – The Engineered Wood Association | Feb 14, 2020

Beauty and the Budget

Engineered Wood’s Appeal is More Than Skin Deep

boombox1 - default
boombox2 -
native1 -
halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021