flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Multipurpose sports facility will be first completed building at Obama Presidential Center

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

Located in Chicago’s Jackson Park, the 45,000-sf multipurpose sports facility and events space features a regulation-size NBA basketball court. The facility’s design is inspired by two of President Obama’s passions: basketball and community building.


By Novid Parsi, Contributing Editor  | April 8, 2024
Multipurpose sports facility will be first completed building at Obama Presidential Center
Rendering: Obama Foundation

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. 

Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan. Elevate Design Builders, a joint firm led by Bowa Construction and AECOM Hunt, is the builder.

The Home Court features a regulation-size NBA basketball court with intersecting practice courts, flexible seating, fitness equipment, and training spaces. A mezzanine level provides additional seating for an intimate spectator experience. Home Court also offers multipurpose spaces for community activities.

The Home Court’s design is inspired by two of President Obama’s passions: basketball and community building. The sleek metal and glass panel exterior has been patterned to evoke a basketball net and community connection. The expansive, east-facing glass façade—fritted to protect birds by keeping them from striking it—will offer views of the campus.

“From the outset, President Obama knew he wanted our Home Court to be a place where people could come for fun, inspiration, and learning—the kind of community spaces we need in an inclusive democracy,” Obama Foundation CEO Valerie Jarrett said in a statement. “We intend for it to be an extraordinary resource to our community that will allow families to improve their health and wellness, and participate in educational and career readiness programming all in hopes of building a brighter, healthier future.”  

The design aligns with the Obama Foundation’s sustainability goals for the campus. The two-story lobby will provide natural light for many of the building’s interior spaces. Like the rest of the campus, the Home Court will be heated and cooled mostly with geothermal energy, part of the campus-wide strategy to avoid using fossil fuels.

Rendering: Obama Foundation
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation
Multipurpose sports facility will be first completed space at Obama Presidential Center
Rendering: Obama Foundation

 

Related Stories

| Aug 11, 2010

PCL Construction, HITT Contracting among nation's largest commercial building contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Commercial Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Webcor, Hunt Construction lead the way in mixed-use construction, according to BD+C's Giants 300 report

A ranking of the Top 30 Mixed-Use Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Clark Group, Hensel Phelps among nation's largest federal government contractors, according to BD+C's Giants 300 report

A ranking of the Top 40 Federal Government Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Report: Fraud levels fall for construction industry, but companies still losing $6.4 million on average

The global construction, engineering and infrastructure industry saw a significant decline in fraud activity with companies losing an average of $6.4 million over the last three years, according to the latest edition of the Kroll Annual Global Fraud Report, released today at the Association of Corporate Counsel’s 2009 Annual Meeting in Boston. This new figure represents less than half of last year’s amount of $14.2 million.

| Aug 11, 2010

Jacobs, HDR top BD+C's ranking of the nation's 100 largest institutional building design firms

A ranking of the Top 100 Institutional Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Walt Disney Family Museum planned in San Francisco

Construction is under way on a new museum dedicated to the man behind the Disney empire. Set to open this fall in San Francisco, the Walt Disney Family Museum will feature 10 galleries, starting with Disney's beginnings on a Missouri farm.

| Aug 11, 2010

Draft NIST report on Cowboys practice facility collapse released for public comment

A fabric-covered, steel frame practice facility owned by the National Football League’s Dallas Cowboys collapsed under wind loads significantly less than those required under applicable design standards, according to a report released today for public comment by the Commerce Department's National Institute of Standards and Technology (NIST).

| Aug 11, 2010

David Rockwell unveils set for upcoming Oscar show

The Academy of Motion Picture Arts and Sciences and 82nd Academy Awards® production designer David Rockwell unveiled the set for the upcoming Oscar show.

| Aug 11, 2010

Renovated city hall to revitalize California city

Los Angeles-based Nadel Architects has completed a $91 million revitalization of three landmark buildings in the Richmond (Calif.) Civic Center: City Hall, the Hall of Justice, and the Civic Auditorium/Art Center. Replacement of exterior glazing, rehabilitation of the exterior envelope, and installation of stone panels and brick bring the center back to its 1930s feel.

boombox1 - default
boombox2 -
native1 -

More In Category




Museums

Nebraska’s Joslyn Art Museum to reopen this summer with new Snøhetta-designed pavilion

In Omaha, Neb., the Joslyn Art Museum, which displays art from ancient times to the present, has announced it will reopen on September 10, following the completion of its new 42,000-sf Rhonda & Howard Hawks Pavilion. Designed in collaboration with Snøhetta and Alley Poyner Macchietto Architecture, the Hawks Pavilion is part of a museum overhaul that will expand the gallery space by more than 40%.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021