flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Silverstein Properties waffles on what to do with Far West Side property

High-rise Construction

Silverstein Properties waffles on what to do with Far West Side property

The company has gone from a two-tower design, to a supertall, and now, supposedly, back to a two-tower design.


By David Malone, Associate Editor | January 27, 2017

Silverstein Properties original two-tower design. Rendering courtesy of Oppenheim Architecture + Design.

The more indecisive among us will be able to relate to the back and forth dance Silverstein Properties is currently doing as it tries to make a decision about what to build on a large property in Manhattan’s Far West Side.

Before purchasing a Mercedes-Benz dealership on the site for $115 million and demolishing it back in 2015, Silverstein announced its plans to build two 60-story-plus towers with a total of around 1,000 apartment units. But after the purchase was made official, Silverstein instead decided to build a 1,100-foot tower with 1,400 apartments and a large retail component, Curbed New York reports.

But the best laid schemes of mice and men often go awry, and Silverstein has once again scrapped its plans and appears to be pursuing a different approach. The new plan, which, according to Crain’s, has not been set in stone, eliminates the supertall tower and goes back to a two-tower approach; one residential and one commercial.

This time, however, the project would be constructed in two phases. The first phase of the new plan would see a CetraRuddy-designed 600,000-sf condo tower rise on the site. Building the residential tower first would prove to be more lucrative and could help fund the construction of the second tower in phase two. The second tower would be the larger tower of the two, comprising 1.2 million sf of office space.

Plans have not been filed for the new two-tower project yet, however, and Silverstein is still exploring other options for the site. So don’t be too surprised if another change of plans occurs.

Related Stories

| Mar 13, 2012

China's high-speed building boom

A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.

| Mar 12, 2012

Improving the performance of existing commercial buildings: the chemistry of sustainable construction

Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.

| Feb 14, 2012

Thornton Tomasetti names Al Hashimi vice president for its Middle East Operations

Al Hashimi is joining the company to help expand Thornton Tomasetti’s business in the region and support clients locally.

| Feb 8, 2012

World’s tallest solar PV-installation

The solar array is at the elevation of 737 feet, making the building the tallest in the world with a solar PV-installation on its roof.

| Jan 30, 2012

Hollister Construction Services to renovate 30 Montgomery Street in Jersey City, N.J.

Owner Onyx Equities hires firm to oversee comprehensive upgrades of office building.

| Jan 16, 2012

Mid-Continent Tower wins 25 Year Award from AIA Eastern Oklahoma

Designed by Dewberry, iconic tower defines Tulsa’s skyline.

| Jan 4, 2012

Shawmut Design & Construction awarded dorm renovations at Brown University

Construction is scheduled to begin in June 2012, and will be completed by December 2012.

| Jan 3, 2012

Rental Renaissance, The Rebirth of the Apartment Market

Across much of the U.S., apartment rents are rising, vacancy rates are falling. In just about every major urban area, new multifamily rental projects and major renovations are coming online. It may be too soon to pronounce the rental market fully recovered, but the trend is promising.

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 21, 2011

BBI key to Philly high-rise renovation

The 200,000 sf building was recently outfitted with a new HVAC system and a state-of-the-art window retrofitting system.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021