flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Shedd Aquarium unveils its $500 million vision for the future

Museums

The Shedd Aquarium unveils its $500 million vision for the future

The project will prepare the aquarium for the next 100 years.


By David Malone, Managing Editor | January 14, 2022
Shedd Aquarium, exhibit space
All images courtesy Shedd Aquarium

The Shedd Aquarium has unveiled its strategic vision for the next 100 years. The vision, dubbed the Centennial Commitment due to the organization’s 100th anniversary in 2030, is aimed at ensuring a more equitable, sustainable, and thriving future for people and aquatic life.

The Centennial Commitment centers around three primary pillars - For People, For Communities, and For Aquatic Life. These pillars include:

  • Deeper community investments and partnerships
  • A modernized aquarium experience through the transformation and restoration of the historic galleries and dynamic new exhibits that provide greater and more accessible entry points
  • New educational and experiential programs
  • Digital engagements that bring animals and conservation action programs from the aquarium into more hands and homes
  • Advancements in animal care and welfare
  • Accelerated aquatic research and science

Shedd Aquarium learning space

Half of the $500 million budget will power the programs and partnerships needed to achieve the Centennial Commitment’s aspirations while the other half will focus on the needed physical improvements to the historic Beaux-Arts-style building that will modernize the aquarium galleries and experience, enable greater accessibility, enhance animal habitats, and restore architectural features such as the opening of original windows that provide views of the Chicago skyline and Lake Michigan and unobstructed public access to the building’s original exterior promenade and garden spaces.

Shedd Aquarium experiential space

The multi-year, four phase construction project will begin in late 2022. Project highlights include:

  • A modernized experience that will feature more accessible, interactive, highly immersive, and science-rich galleries
  • A new learning commons located at the historic core of the aquarium on the main level that will serve as a launchpad and increase the amount of existing classroom space
  • A centralized science hub that will merge five existing scientific laboratories into one central hub spanning microbial ecology, conservation science, water quality and chemistry, genome studies, and pathology
  • New circulation pathways that will significantly reduce the number of transitions between areas of the aquarium, allowing guests to have multiple options regarding where they can start their journey and making navigation easier.
  • Four acres of activated outdoor green space around the building that will increase natural connections to nature and bolster resilience on the lakefront while also adding experiential blue and environmental improvements.

Shedd Aquarium exhibit

The modernization of the historic galleries will serve as the largest capital project for the organization in recent history, preceded by the expansion of the Abbott Oceanarium in 1991 (and its reimagination in 2008), Amazon Rising exhibit in 2001, and Wild Reef exhibit in 2003.

The build team will include Pepper/BMI Construction (general contractor partners), Valerio Dewalt Train (architect), Thinc Design (exhibit design partner), JLL (project manager), Institute for Human Centered Design (accessibility partner), and Trinal (equity and inclusion partner).

Construction is slated to conclude in 2026 with new galleries, programs, and experiences opening each year on a rolling basis.

Tags

Related Stories

Museums | Oct 29, 2021

Rowan University’s new fossil museum sits within an active dinosaur fossil dig

   Ennead Architects (Design Architect) together with KSS Architects (Architect of Record) are designing the project.

Museums | Oct 15, 2021

Kunsthaus Zürich extension opens to the public

David Chipperfield Architects Berlin designed the project.

Museums | Sep 27, 2021

The Academy Museum of Motion Pictures set to open on Sept. 30 in Los Angeles

Renzo Piano Building Workshop designed the project.

Museums | Aug 31, 2021

The Making of Harry Potter tour set to open on former Toshimaen amusement park grounds

Warner Bros. Studio Tour Tokyo will operate the facility.

Giants 400 | Aug 30, 2021

2021 Giants 400 Report: Ranking the largest architecture, engineering, and construction firms in the U.S.

The 2021 Giants 400 Report includes more than 130 rankings across 25 building sectors and specialty categories.

Museums | Aug 27, 2021

DLR Group to design new facility for Jacksonville’s Museum of Science & History

The  museum has outgrown its location on the Southbank of Downtown Jacksonville.

Museums | Aug 24, 2021

MAD Architects unveils design for Hainan Science and Technology Museum

The project is slated to break ground in late August.

Resiliency | Aug 19, 2021

White paper outlines cost-effective flood protection approaches for building owners

A new white paper from Walter P Moore offers an in-depth review of the flood protection process and proven approaches.

Museums | Aug 17, 2021

The Rubin Museum of Art’s Mandala Lab set to open

The new space occupies the museum’s third floor.

boombox1
boombox2
native1

More In Category



Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021