flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

A new communications platform aims to help sports and entertainment venues operate greener

Arenas

A new communications platform aims to help sports and entertainment venues operate greener

GOAL (for Green Operations and Advanced Leadership) will give operators ways to gauge their sustainability journeys.


By John Caulfield, Senior Editor | February 14, 2023
A rendering of CFG Bank Arena in Baltimore, whose $200 million renovation lowered its carbon footprint.
CFG Bank Arena in Baltimore lowered its carbon footprint through a $200 renovation when compared to what that footprint would have been from new construction. Images courtesy of Green Operations and Advanced Leadership

This month, the 14,000-seat CFG Bank Arena in Baltimore, which operates out of a building that dates back to 1962, completed a $200 million renovation. Using the engineering firm Buro Happold’s Life Cycle Assessment toolkit, the building’s operator Oak View Group was able to measure the reno’s environmental impact, which compared to new construction reduced the embodied carbon of structural materials used by 95 percent to 8,000 megatons, 50,000-plus tons of structural waste that otherwise would have resulted from demolition, 6 million pounds of steel that would have been melted or disposed of, and 24,000 cubic yards of concrete that would have ended up in landfills.

CFG Bank Arena is one of 18 founding members of Green Operations and Advanced Leadership (GOAL), a nascent platform that helps sports and entertainment venues operate in environmentally sound ways. GOAL’s members pay a fee for access, via Amazon Web Services-powered software, to “points of engagement” that include library resources, cross-venue collaboration and sharing of best practices, leveraging data to measure, track and analyze venue performance; as well as validation and recognition.

Los Angeles-based Oak View Group, which launched GOAL, is a development and ownership firm specializing in sports and entertainment venues, with over 200 clients. It is one of GOAL’s four equity partners along with the Atlanta Hawks and State Farm Arena, Fenway Sports Group, and the architect James F. McClennan, who founded the International Living Future Institute, created the Living Building Challenge, and coauthored the WELL Building Standard. McClennan worked with Oak View Group on developing the design and operations for Climate Pledge Arena in Seattle, which is generally considered one of the most progressive and sustainable venues in the country.

 

Solar panels power Climate Pledge Arena
Solar panels power Seattle's Climate Pledge Arena, a model for sustainability.
 

Kristen Fulmer, GOAL’s sustainability director, tells BD+C that GOAL is filling a void in markets where there are lots of industry examples and guidelines for green construction, but “there are no great best practices or guidance for operations toward sustainability.”

GOAL’s objective, she says, is to come up with guidelines that take these venues beyond LEED compliance. Sports Business Journal reported that McClennan’s role with GOAL will be working with Fulmer to continually update the platform’s standards, protocols, and tools. “We want to work with venues that are ready to take on sustainability,” she tells BD+C. “There’s no longer a question of need, but knowing either where to start or what next step to take.”

Peer reviews available

Fulmer acknowledges that some of GOAL’s members are farther along on their sustainable journeys than others. For example, State Farm Arena is zero-waste certified, which means it is diverting at least 90 percent of its waste from landfills. The arena also recently switched from single-stream to multi-stream recycling, increasing the value of its recyclables. But Fulmer points out that State Farm Arena has yet to conduct carbon emissions measurements.

One of GOAL’s strength, she says, is that its members will be able to use data and communication tools to compare their status and progress against other venues at roughly the same level of sustainability, and to customize their own roadmap toward hitting sustainable targets.

 

State Farm Arena is zero-waste certified
State Farm Arena in Atlanta diverts at least 90 percent of its waste from landfills.
 

Part of a ‘movement’

The Building Team on the CFG Bank Arena reno included SCI Architects, Baltimore-based interior design firm The Adams Design Group, and the general contractor Clark Construction. Fulmer asserts that AEC firms should be paying attention to GOAL because “it’s showing a collective movement toward sustainability, which could drive the industry toward greater collaboration.” She also notes that the development model has been shifting toward sports and entertainment districts and mixed-use, for which sustainability is becoming more of an imperative.

To grow, GOAL is seeking partnerships with other ownership groups, and is leaning toward the car racing and convention center sectors, both of which Fulmer says have shown interest in tapping into GOAL’s resources and network. The organization is also planning an annual sustainability conference.

GOAL might also benefit from the strategic alliance that Oak View Group’s venue management arm, OVG360, struck last October with Green Sports Alliance, to support the sports industry’s response to climate change. That pairing is expected to lead to greening events and better collaboration among the two partners’ membership.

Related Stories

Sports and Recreational Facilities | Jul 29, 2015

Milwaukee Bucks arena deal approved by Wisconsin state assembly

Created by Milwaukee firm Eppstein Uhen Architects and global firm Populous, the venue will be built in downtown Milwaukee. Its design draws inspiration from both Lake Michigan, which borders Milwaukee, and from aspects of basketball, like high-arcing free throws.

Sports and Recreational Facilities | Apr 24, 2015

HOK unveils renderings and video of new St. Louis NFL stadium

Retractable seating in the corners will allow the stadium to be used for FIFA or Major League Soccer matches, as it expands the field to a FIFA-regulated 120 yards long and 75 yards wide.

Sports and Recreational Facilities | Apr 9, 2015

Design for new Milwaukee Bucks arena is ‘modest and modernist’

Designed by local firm Eppstein Uhen Architects and global firm Populous, the sports venue will prominently feature a swoop, which some journalists and critics have likened to an inverted Nike swoosh.

Sports and Recreational Facilities | Mar 19, 2015

Populous design wins competition for UK's most sustainable arena

The live-concert venue will seat an audience of 12,000, which the firm says will be masked by “the atmosphere and intimacy of a 4,000-seat amphitheatre.” 

Sports and Recreational Facilities | Mar 11, 2015

Foster + Partners wins bid for 2022 World Cup centerpiece stadium in Qatar

Norman Foster described the design as “an exciting step forward in stadium design—it will be the first to break the mold of the free-standing suburban concept, and instead anticipates the grid of this future city.” 

Sports and Recreational Facilities | Mar 5, 2015

New HOK designs for St. Louis NFL stadium unveiled

Missouri Governor Jay Nixon has assembled a task force to develop plans for an open-air NFL stadium on the North Riverfront of downtown St. Louis.

| Jan 5, 2015

Another billionaire sports club owner plans to build a football stadium in Los Angeles

Kroenke Group is the latest in a series of high-profile investors that want to bring back pro football to the City of Lights.

| Jan 2, 2015

Construction put in place enjoyed healthy gains in 2014

Construction consultant FMI foresees—with some caveats—continuing growth in the office, lodging, and manufacturing sectors. But funding uncertainties raise red flags in education and healthcare.

| Dec 30, 2014

A simplified arena concept for NBA’s Warriors creates interest

The Golden State Warriors, currently the team with the best record in the National Basketball Association, looks like it could finally get a new arena.

BIM and Information Technology | Dec 28, 2014

The Big Data revolution: How data-driven design is transforming project planning

There are literally hundreds of applications for deep analytics in planning and design projects, not to mention the many benefits for construction teams, building owners, and facility managers. We profile some early successful applications.  

boombox1 - default
boombox2 -
native1 -

More In Category




Giants 400

Top 70 Sports Facility Construction Firms for 2023

AECOM, Turner Construction, Clark Group, Mortenson head BD+C's ranking of the nation's largest sports facility contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021